10.09.2015 Views

NAVY SCHOOL MANAGEMENT MANUAL

NAVY SCHOOL MANAGEMENT MANUAL - AIM

NAVY SCHOOL MANAGEMENT MANUAL - AIM

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

applicable to the contractor within the<br />

timeframes as specified in the SOW.<br />

• Contract Data Requirements List (CDRL). The<br />

government shall provide a list of contract data<br />

requirements that are authorized for the<br />

acquisition. Data item deliveries are key<br />

factors in demonstrating successful performance<br />

under the contract.<br />

• Technical Requirements. The contractor shall<br />

provide qualified/experienced personnel for<br />

curriculum development. All specific<br />

qualifications for personnel shall be listed in<br />

this paragraph. All deliverables will be<br />

developed per directives and instructions current<br />

when the delivery order is issued as listed in<br />

the previous section.<br />

<br />

Training Material Development. A systematic approach to<br />

training shall be used to develop training materials. The<br />

systems approach proceeds from an analysis of job task to a<br />

selection of tasks to be trained, the identification of<br />

skills and knowledge required to support those tasks, the<br />

development of objectives, the design and development of<br />

training materials, the implementation of courses, and the<br />

evaluation of courses and course materials. Since several<br />

curriculum development standards are in use, procedures to<br />

be followed will be specified in the contract or delivery<br />

order. The SOW/delivery order may or may not include all<br />

the processes involved in the systematic approach. List<br />

all that apply.<br />

<br />

<br />

<br />

Analyze. An analysis of the job shall be done to<br />

inventory tasks, which must be performed to determine<br />

the specific skills and knowledge required for each<br />

task. Deliverables may include, but are not limited<br />

to Course Training Task List (CTTL), PPP, or TPP.<br />

Design. Involves the conversion of tasks into<br />

objectives, the determination of test items, the<br />

sequencing of the information taught, and the<br />

selection of the media required to support the<br />

training. Deliverables may include, but are not<br />

limited to Manpower Personnel Training Analysis<br />

Report, Curriculum Outline, Course Master<br />

Schedule/Master Course Schedule, and Training Course<br />

Control Document.<br />

Develop. Involves writing learning activities and<br />

developing materials, which will be used by<br />

6-24<br />

NAVEDTRA 135C

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!