CCMM for audit trail purposes only. Refer to Chapter 4, Section<br />

1. The type of planning document used will vary based on the<br />

standard. For the purpose of the FCR, the following information<br />

will be on file:<br />

<br />

<br />

<br />

Training Project Plan (format will vary)<br />

Approval letter (approval authority will vary)<br />

Accurate milestones<br />

Analysis<br />

<br />

A copy of the analysis document and approval letters should<br />

be maintained by the CCMM. For courses developed using the<br />

different equipment based standards, applicable PPP tables<br />

should be on file with the CCMM. Analysis documentation<br />

and approval authority for courses developed using task<br />

analysis standards will vary. The FCR should focus on the<br />

following since the type of document on file is not<br />

important.<br />

<br />

<br />

<br />

Has an analysis been conducted?<br />

Is the information in the course consistent with the<br />

analysis?<br />

Is the course material based on valid analysis<br />

information?<br />

<br />

If the information contained in the analysis document is<br />

not current and/or not accurate, the findings will be<br />

summarized in the summary sheets and recommendations<br />

forwarded to the CCA for action. Possible recommended<br />

actions include requests for Human Performance Requirements<br />

Review or a complete job analysis.<br />

Design<br />

<br />

The design document should be approved by the appropriate<br />

higher authority. The CCMM will provide the participating<br />

sites with a copy of the appropriate design document. As<br />

with the Planning and Analysis phases, the type of design<br />

document, approval authority and document format will vary<br />

between developmental standards. During the FCR the<br />

emphasis should be placed on content and accuracy of the<br />

document(s).<br />

<br />

<br />

Are the objectives accurate?<br />