12.02.2013 Views

Design and Construction Handbook - Los Angeles World Airports

Design and Construction Handbook - Los Angeles World Airports

Design and Construction Handbook - Los Angeles World Airports

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Guide Specification<br />

11. ISO/IEC 11801 Information Technology - Generic Cabling For Customer Premises<br />

12. LADBS <strong>Los</strong> <strong>Angeles</strong> Department of Building <strong>and</strong> Safety - City of <strong>Los</strong> <strong>Angeles</strong><br />

Electrical Code<br />

13. NEMA 250 Enclosures for Electrical Equipment (1000 V Maximum)<br />

14. NFPA-70 National Electric Code; 2008<br />

15. UL 1459 Underwriters Laboratories St<strong>and</strong>ard for Safety – Telephone Equipment<br />

16. UL 1863 Underwriters Laboratories St<strong>and</strong>ard for Safety – Communications Circuit<br />

Accessories<br />

B. References to codes <strong>and</strong> st<strong>and</strong>ards called for in the Specifications refer to the latest edition,<br />

amendments, <strong>and</strong> revisions to the codes <strong>and</strong> st<strong>and</strong>ards in effect on the date of these<br />

Specifications.<br />

1.5 QUALITY ASSURANCE<br />

A. The Contractor’s Quality Assurance Inspector shall conduct a visual inspection of all<br />

installations to verify that the installations are in accordance with the LAWA’s <strong>and</strong><br />

manufacturer's specifications. Records of the inspections signed <strong>and</strong> dated by the Quality<br />

Assurance Inspector shall be provided to the <strong>Design</strong> Consultant. The <strong>Design</strong> Consultant shall<br />

be notified by the Contractor of any inspection(s) <strong>and</strong> the <strong>Design</strong> Consultant may elect to<br />

participate in any inspection(s). All QC information shall be provided to LAWA for input into<br />

the CMMS (refer to paragraph 3.13).<br />

1.6 SUBSTITUTION OF EQUIPMENT<br />

A. Approval of alternate or substitute equipment or material in no way voids Specification<br />

requirements.<br />

B. Under no circumstances shall the LAWA be required to prove that an item proposed for<br />

substitution is not equal to the specified item. It shall be m<strong>and</strong>atory that the Contractor submits<br />

to Engineer all evidence to support the contention that the item proposed for substitution is<br />

equal to the specified item. The Owner’s decision as to the equality of substitution shall be final<br />

<strong>and</strong> without further recourse.<br />

C. In the event that the <strong>Design</strong> Consultant is required to provide additional engineering services as<br />

a result of substitution of equivalent materials or equipment by the Contractor, or changes by<br />

the Contractor in dimension, weight, power requirements, etc., of the equipment <strong>and</strong> accessories<br />

furnished, or if the <strong>Design</strong> Consultant is required to examine <strong>and</strong> evaluate any changes<br />

proposed by the Contractor for the convenience of the Contractor, then the <strong>Design</strong> Consultant’s<br />

expenses in connection with such additional services shall be paid by the Contractor <strong>and</strong> may be<br />

deducted from any moneys owed to the Contractor.<br />

COMMUNICATION SYSTEMS INTERFACES (LEGACY SYSTEMS)<br />

27 13 33 - 4<br />

Communication Systems

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!