12.02.2013 Views

Design and Construction Handbook - Los Angeles World Airports

Design and Construction Handbook - Los Angeles World Airports

Design and Construction Handbook - Los Angeles World Airports

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Guide Specification<br />

3.5 DOMESTIC WATER HEAT EXCHANGER INSULATION SCHEDULE<br />

A. Round, exposed breeching <strong>and</strong> connector insulation shall be the following:<br />

1. Calcium Silicate: 4 inches thick.<br />

2. High-Temperature Mineral-Fiber Blanket: 3 inches thick <strong>and</strong> 3-lb/cu. ft. nominal<br />

density.<br />

3. High-Temperature Mineral-Fiber Board: 3 inches thick <strong>and</strong> 6-lb/cu. ft. nominal density.<br />

B. Round, concealed breeching <strong>and</strong> connector insulation shall be the following:<br />

1. Calcium Silicate: 4 inches thick.<br />

2. High-Temperature Mineral-Fiber Blanket: 3 inches thick <strong>and</strong> 3-lb/cu. ft. nominal<br />

density.<br />

3. High-Temperature Mineral-Fiber Board: 3 inches thick <strong>and</strong> 6-lb/cu. ft. nominal density.<br />

C. Rectangular, exposed breeching <strong>and</strong> connector insulation shall be the following:<br />

1. Calcium Silicate: 4 inches thick.<br />

2. High-Temperature Mineral-Fiber Blanket: 3 inches thick <strong>and</strong> 3-lb/cu. ft. nominal<br />

density.<br />

3. High-Temperature Mineral-Fiber Board: 3 inches thick <strong>and</strong> 6-lb/cu. ft. nominal density.<br />

D. Rectangular, concealed breeching <strong>and</strong> connector insulation shall be the following:<br />

1. Calcium Silicate: 4 inches thick.<br />

2. High-Temperature Mineral-Fiber Blanket: 3 inches thick <strong>and</strong> 3-lb/cu. ft. nominal<br />

density.<br />

3. High-Temperature Mineral-Fiber Board: 3 inches thick <strong>and</strong> 6-lb/cu. ft. nominal density.<br />

3.6 OUTDOOR, UNDERGROUND PIPING INSULATION SCHEDULE<br />

A. Grease Waste Piping, All Sizes, Where Heat Tracing Is Installed: Cellular glass, 2 inches<br />

thick.<br />

3.7 UNDERGROUND, FIELD-INSTALLED INSULATION JACKET<br />

A. For underground direct-buried piping applications, install underground direct-buried jacket<br />

over insulation material.<br />

END OF SECTION 22 07 00<br />

PLUMBING INSULATION<br />

22 07 00 - 20 Plumbing Systems

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!