12.02.2013 Views

Design and Construction Handbook - Los Angeles World Airports

Design and Construction Handbook - Los Angeles World Airports

Design and Construction Handbook - Los Angeles World Airports

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Guide Specification<br />

SECTION 26 05 13 - MEDIUM-VOLTAGE CABLES<br />

PART 1 - GENERAL<br />

1.1 SUMMARY<br />

A. Section Includes:<br />

1.2 REFERENCES<br />

1. Medium voltage cable.<br />

2. Cable terminations.<br />

3. Fireproofing tape.<br />

4. Underground cable markers.<br />

5. Bedding <strong>and</strong> cover materials.<br />

A. International Electrical Testing Association:<br />

1. NETA ATS - Acceptance Testing Specifications for Electrical Power<br />

Distribution Equipment <strong>and</strong> Systems.<br />

B. Institute of Electrical <strong>and</strong> Electronics Engineers.<br />

1. IEEE 48 – St<strong>and</strong>ard Test Procedures <strong>and</strong> Requirements for Alternating Current<br />

Cable Terminations 2.5 kV thru 765 kV<br />

2. IEEE C2 – National Electrical Safety Code.<br />

C. National Electrical Manufacturers Association<br />

1.3 SUBMITTALS<br />

1. NEMA WC3 – Rubber Insulated Wire <strong>and</strong> Cable for the Transmission <strong>and</strong><br />

Distribution of Electrical Energy.<br />

2. NEMA WC 5 – Thermoplastic Insulated Wire <strong>and</strong> Cable for the Transmission<br />

<strong>and</strong> Distribution of Electrical Energy.<br />

3. NEMA WC 7 – Cross Linked Thermosetting Polyethylene Insulated Wire <strong>and</strong><br />

Cable for the Transmission <strong>and</strong> Distribution of Electric Energy.<br />

4. NEMA WC 8 – Ethylene Propylene Rubber Insulated Wire <strong>and</strong> Cable for the<br />

Transmission <strong>and</strong> Distribution of Electrical Energy.<br />

A. Product Data: Submit for cable, terminations, <strong>and</strong> accessories.<br />

B. Test Reports: Indicate results of cable test in tabular form <strong>and</strong> in plots of current versus<br />

voltage for incremental voltage steps, <strong>and</strong> current versus time at 30 second intervals at<br />

maximum voltage.<br />

MEDIUM-VOLTAGE CABLES<br />

26 05 13 - 1 Electrical Systems

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!