Guide Specification<br />

1) After conclusion of Phase III or termination of testing, identify all failures,<br />

determine causes, <strong>and</strong> repair. Submit explaining the nature of each failure,<br />

corrective action taken, results of tests performed, <strong>and</strong> recommended point<br />

for resumption of testing.<br />

2) After submission of report schedule review meeting at job site. Schedule<br />

date <strong>and</strong> time with the <strong>Design</strong> Consultant.<br />

3) At review meeting, demonstrate that all failures have been corrected by<br />

performing verification tests.<br />

4) Based on report <strong>and</strong> review meeting, the <strong>Design</strong> Consultant will approve<br />

endurance test or direct Contractor to repeat all or part of Phases III <strong>and</strong> IV.<br />

8. Adjustment, Correction, <strong>and</strong> Maintenance<br />

a. During endurance testing make adjustments <strong>and</strong> corrections to system only after<br />

obtaining written approval of the <strong>Design</strong> Consultant.<br />

b. During endurance testing, perform required maintenance on systems including<br />

provision of replacement parts.<br />

E. Commissioning Testing<br />

1. The Contractor shall develop a commissioning test plan that includes the following<br />

components, as a minimum:<br />

a. LAWA readiness<br />

b. Operational procedures verification<br />

c. Disaster recovery procedures<br />

d. Computerized Maintenance Management System data verification<br />

e. Change management procedures<br />

2. The commissioning test plan/procedures shall be submitted to the Engineer for review<br />

<strong>and</strong> approval.<br />

F. Final Inspection <strong>and</strong> Acceptance<br />

1. After endurance testing is complete, review tabulated records with the <strong>Design</strong> Consultant.<br />

2. The Contractor will not be responsible for failures caused by:<br />

a. Outage of main power in excess of backup power capability provided that<br />

automatic initiation of all backup sources was accomplished <strong>and</strong> automatic<br />

shutdowns <strong>and</strong> restarts of systems performed as specified.<br />