Guide Specification<br />

PAGING SYSTEMS<br />

27 51 13 - 28<br />

i. Daily entries of performance data shall be reviewed by the <strong>Design</strong> Consultant’s<br />

representative designated to observe monitoring of system.<br />

5. The <strong>Design</strong> Consultant may terminate testing at any time when the system fails to<br />

perform as specified. Upon termination of testing the Contractor shall commence an<br />

assessment period as described in Phase II.<br />

6. Testing<br />

a. Phase I - Initial Testing:<br />

1) Time: 24 hours per day for 15 consecutive calendar days.<br />

2) Make no repairs during this phase unless authorized in writing by the<br />

<strong>Design</strong> Consultant.<br />

3) If system experiences no failures, proceed to Phase III - Final Testing.<br />

b. Phase II - Initial Assessment:<br />

1) After conclusion of Phase I or terminating of testing, identify all failures,<br />

determine causes, <strong>and</strong> repair. Submit report explaining: Nature of each<br />

failure, corrective action taken, results of tests performed to verify<br />

corrective action as being successful, <strong>and</strong> recommended point for<br />

resumption of testing.<br />

2) After submission of report, schedule review meeting at job site. Schedule<br />

date <strong>and</strong> time with the <strong>Design</strong> Consultant.<br />

3) At review meeting, demonstrate that all failures have been corrected by<br />

performing verification tests.<br />

4) Based on report <strong>and</strong> review meeting, the <strong>Design</strong> Consultant will direct<br />

Contractor to repeat Phase I, restart Phase I, or proceed to Phase III - Final<br />

Testing.<br />

c. Phase III - Final Testing:<br />

1) Time: 24 hours per day for 15 consecutive calendar days.<br />

2) Make no repairs during this phase unless authorized in writing by Engineer.<br />

.<br />

7. Phase IV - Final Assessment:<br />

1) After conclusion of Phase III or termination of testing, identify all failures,<br />

determine causes, <strong>and</strong> repair. Submit explaining the nature of each failure,<br />

corrective action taken, results of tests performed, <strong>and</strong> recommended point<br />

for resumption of testing.<br />