Guide Specification<br />

PAGING SYSTEMS<br />

27 51 13 - 26<br />

e. Test Resolution: Any discrepancies or problems discovered during these tests<br />

shall be corrected by the Contractor at no cost to the Owner. The problems<br />

identified in each phase shall be corrected <strong>and</strong> the percentage of the entire system<br />

re-tested determined by the <strong>Design</strong> Consultant, before any subsequent testing<br />

phase is performed.<br />

C. Performance Verification Testing<br />

1. Complete operational testing of all components <strong>and</strong> systems shall be witnessed by<br />

designated LAWA Representatives.<br />

2. Schedule test with <strong>Design</strong> Consultant. Do not begin testing until:<br />

a. All systems have been installed <strong>and</strong> individually <strong>and</strong> jointly tested to ensure they<br />

are operating properly.<br />

b. Written permission from <strong>Design</strong> Consultant has been received.<br />

3. Testing: As part of performance verification, test all components of system. The tests<br />

shall demonstrate system features.<br />

4. Verification: Verify correct operation of the required system functionality as defined in<br />

these specifications.<br />

5. Adjustment, Correction, <strong>and</strong> Completion:<br />

a. Correct deficiencies <strong>and</strong> retest affected components.<br />

b. Make necessary adjustments <strong>and</strong> modification to system after obtaining approval<br />

of the <strong>Design</strong> Consultant.<br />

c. Completion: Performance verification test shall be complete when testing or<br />

retesting of each component has produced a positive result <strong>and</strong> has been approved<br />

in writing by the <strong>Design</strong> Consultant.<br />

6. Recording:<br />

a. Describe actual operational tests performed <strong>and</strong> equipment used <strong>and</strong> list personnel<br />

performing tests.<br />

b. Record in tabular form all test results, deficiencies, <strong>and</strong> corrective measures.<br />

7. Termination<br />

a. Performance verification test shall be terminated by the <strong>Design</strong> Consultant when:<br />

1) Individual components, subsystems, or the integrated system fail to perform<br />

as specified.<br />