Guide Specification<br />

4. System configuration with peripheral devices, batteries, power supplies, diagrams,<br />

modems, <strong>and</strong> interconnections.<br />

5. Description <strong>and</strong> sequence of operation for operating, user, <strong>and</strong> application software.<br />

6. Use terminology in submittals conforming to ASME MC85.1.<br />

B. Product Data: Submit data for each system component <strong>and</strong> software module.<br />

C. Manufacturer's Installation Instructions: Submit installation instruction for each control<br />

system component.<br />

D. Manufacturer's Certificate: Certify products meet or exceed specified requirements.<br />

1.5 CLOSEOUT SUBMITTALS<br />

A. Project Record Documents: Record actual locations of control components, including control<br />

units, thermostats, <strong>and</strong> sensors.<br />

1. Revise shop drawings to reflect actual installation <strong>and</strong> operating sequences.<br />

2. Submit data specified in "Submittals" in final "Record Documents" form.<br />

B. Operation <strong>and</strong> Maintenance Data:<br />

1. Submit interconnection wiring diagrams complete field installed systems with identified<br />

<strong>and</strong> numbered, system components <strong>and</strong> devices. Submit paper copies in 3-ring binder <strong>and</strong><br />

electronic copy on CD or DVD.<br />

2. Submit keyboard illustrations <strong>and</strong> step-by-step procedures indexed for each operator<br />

function.<br />

3. Submit inspection period, cleaning methods, cleaning materials recommended, <strong>and</strong><br />

calibration tolerances.<br />

1.6 QUALIFICATIONS<br />

A. Manufacturer: Company specializing in manufacturing products specified in this section with<br />

minimum three years documented experience, <strong>and</strong> with service facilities within 100 miles of<br />

Project.<br />

B. Installer: Company specializing in performing Work of this section with minimum three years<br />

documented experience approved by manufacturer.<br />

1.7 PRE-INSTALLATION MEETINGS<br />

A. Convene minimum two weeks prior to commencing work of this section or at the direction of<br />

LAWA or the General Contractor.<br />

1.8 FIELD MEASUREMENTS<br />

A. Verify field measurements prior to fabrication.<br />

DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC<br />

23 09 23 - 2 Mechanical Systems