12.02.2013 Views

Design and Construction Handbook - Los Angeles World Airports

Design and Construction Handbook - Los Angeles World Airports

Design and Construction Handbook - Los Angeles World Airports

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Guide Specification<br />

a. Thermometer well <strong>and</strong> thermometer.<br />

b. Pressure gage.<br />

c. Shutoff valve.<br />

G. Install the following piping accessories on natural gas piping connections.<br />

1. Strainer.<br />

2. Pressure gage.<br />

3. Shutoff valve.<br />

4. Pressure reducing valve.<br />

H. Install discharge piping from relief valves <strong>and</strong> drain valves to nearest approved receptor.<br />

I. Install circulator <strong>and</strong> diaphragm expansion tank on water heater.<br />

J. Install water heater trim <strong>and</strong> accessories furnished loose for field mounting.<br />

K. Install electrical devices furnished loose for field mounting.<br />

L. Install control wiring between water heater control panel <strong>and</strong> field mounted control devices.<br />

M. Connect flue to water heater outlet, full size of outlet.<br />

N. Domestic Hot Water Storage Tanks:<br />

1. Provide piping support, independent of building structural framing members.<br />

2. Clean <strong>and</strong> flush after installation. Seal until pipe connections are made.<br />

3. Provide seismic bracing.<br />

END OF SECTION 22 34 00<br />

FUEL-FIRED DOMESTIC WATER HEATERS<br />

22 34 00 - 5 Plumbing Systems

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!