• Finalize connection details to existing structure with the Structural<br />

Engineer of Record.<br />

• Provide interfacing details with existing equipment including off site<br />

systems including portals.<br />

f. Schedule<br />

• Provide a schedule of security devices that has been coordinated with<br />

the architectural door hardware schedule using common<br />

nomenclature.<br />

g. Miscellaneous<br />

• Installation st<strong>and</strong>ards <strong>and</strong> LAWA specific commissioning <strong>and</strong> testing<br />

procedures are to be included in the specifications.<br />

Additional Required Documents <strong>and</strong> Information:<br />

• All Architectural drawings are to be stamped <strong>and</strong> signed by a professional<br />

Architect registered in the State of California<br />

• All Mechanical, Electrical, Plumbing <strong>and</strong> Fire Protection Drawings are to be<br />

stamped with appropriate professionals <strong>and</strong> signed by the corresponding design<br />

engineer of record who is registered in the State of California<br />

• All Structural drawings <strong>and</strong> calculations are to be stamped <strong>and</strong> signed by the<br />

Professional Engineer of Record that is registered in the State of California<br />

• Submit updated Cost Estimate<br />

• Submit updated <strong>Construction</strong> Schedule, Phasing Plan <strong>and</strong> Site Logistics Plans<br />

• Provide a Cost Loaded Schedule per LAWA st<strong>and</strong>ards (when required)<br />

• Submit a narrative describing the phasing strategy emphasizing any potential<br />

impacts to other assigned areas within the Terminal Building. This is in addition<br />

to the phasing drawings listed in the drawing requirements<br />

• Provide a separate <strong>and</strong> complete set of Discipline Coordination Drawings<br />

• Provide a full set of Specifications in CSI Format, including schedules for doors<br />

<strong>and</strong> hardware, equipment, furniture, finishes, etc..<br />

• Provide a letter addressed to LAWA signed by the Architect of Record certifying<br />

that all elements of the design, including but not limited to, casework, equipment<br />

<strong>and</strong> signage, indicated on their drawings are ADA compliant<br />

• Submit final LAWA Sustainability Scorecard<br />

<strong>Design</strong> <strong>and</strong> <strong>Construction</strong> H<strong>and</strong>book<br />

42 of 84<br />

H<strong>and</strong>book (Version 3) 01.15.11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!