12.02.2013 Views

Design and Construction Handbook - Los Angeles World Airports

Design and Construction Handbook - Los Angeles World Airports

Design and Construction Handbook - Los Angeles World Airports

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Guide Specification<br />

1.4 CLOSEOUT SUBMITTALS<br />

A. Project Record Documents: Record actual locations of busway routing.<br />

B. Operation <strong>and</strong> Maintenance Data: Submit joint re-tightening schedule.<br />

1.5 QUALIFICATIONS<br />

A. Manufacturer: Company specializing in manufacturing products specified in this section<br />

with minimum five years documented experience.<br />

B. Supplier: Authorized distributor of specified manufacturer with minimum three years<br />

documented experience.<br />

C. All busway components shall be of the same manufacturers as the busway.<br />

1.6 DELIVERY, STORAGE, AND HANDLING<br />

A. H<strong>and</strong>le in accordance with NEMA BU 1.1 <strong>and</strong> manufacturer's written instructions.<br />

B. Protect from moisture by using appropriate coverings. Store in dry interior locations.<br />

1.7 ENVIRONMENTAL REQUIREMENTS<br />

A. Do not install indoor busway until building is closed in <strong>and</strong> suitable temperature<br />

conditions are controlled.<br />

B. Conform to NEMA BU 1 service conditions during <strong>and</strong> after installation of busway.<br />

1.8 FIELD MEASUREMENTS<br />

A. Verify field measurements prior to fabrication.<br />

1.9 SEQUENCING<br />

A. Sequence Work to avoid interferences with building finishes <strong>and</strong> installation of other<br />

products.<br />

PART 2 - PRODUCTS<br />

2.1 BUSWAY<br />

A. Manufacturers:<br />

ENCLOSED BUS ASSEMBLIES<br />

26 25 00 - 2 Electrical Systems

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!