Norman Y. Mineta San José International Airport<br />

Scope of Services Draft<br />

8.3.3. Each set of documents will be evaluated on a scale to be developed as part<br />

of the Project Management Plan.<br />

9. PUBLIC CONSTRUCTION BID PACKAGES<br />

9.1. City <strong>and</strong> DB acknowledge that <strong>Construction</strong> Documents prepared for a design-build<br />

project ordinarily contain less detail than drawings prepared for traditional design-bidbuild<br />

projects. Therefore, if City directs DB to prepare <strong>Construction</strong> Documents that<br />

are 100% complete, but does not direct DB to proceed with construction of the<br />

Project, then DB’s 100% complete <strong>Construction</strong> Documents shall be prepared to that<br />

level of completeness ordinarily found in traditional design-bid-build projects of<br />

similar scope <strong>and</strong> magnitude for the purposes of publicly bidding.<br />

10. CONSTRUCTION ADMINISTRATION<br />

The <strong>Construction</strong> Administration activities provide support to the <strong>Construction</strong> Process for<br />

the duration of the <strong>Construction</strong> period <strong>and</strong> beyond, until Program closeout.<br />

10.1. Tasks<br />

10.1.1. Submittals<br />

10.1.1.1 Ensure that all subcontracted construction <strong>and</strong> material supply is<br />

preceded by appropriate submittals for:<br />

10.1.1.1.1 Product data<br />

10.1.1.1.2 Systems design, including shop drawings, calculations,<br />

performance verification<br />

10.1.1.1.3 Installation requirements<br />

10.1.1.1.4 Maintenance data<br />

10.1.1.1.5 Operations data, including training materials<br />

10.1.1.1.6 Warranties<br />

10.1.1.1.7 Testing <strong>and</strong> inspection data<br />

10.1.1.2 Maintain a log of all submittals required in the Contract Specifications<br />

<strong>and</strong> their status<br />

10.1.1.3 Review <strong>and</strong> action all submittals as many times as required<br />

10.1.1.4 Mock-ups<br />

10.1.1.4.1 Maintain a log of all mock-ups required in the Specifications <strong>and</strong><br />

their status<br />

10.1.1.4.2 Review <strong>and</strong> action all mock-ups at the Jobsite as many times as<br />

required<br />

10.1.1.5 Provide <strong>and</strong> maintain Control Samples at the Jobsite<br />

10.1.2. Periodic observations<br />

10.1.2.1 Provide on-site observations for all disciplines as necessary to ensure<br />

aesthetic quality <strong>and</strong> design integrity.<br />

10.1.2.2 Observe at critical system installation times <strong>and</strong> system testing.<br />

10.1.3. Resident Architectural <strong>and</strong> Engineering Services<br />

Revision G – 15 August 2006 CHAPTER III-01 - <strong>Design</strong> Tasks And Deliverables - 37