12.02.2013 Views

Design and Construction Handbook - Los Angeles World Airports

Design and Construction Handbook - Los Angeles World Airports

Design and Construction Handbook - Los Angeles World Airports

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Guide Specification<br />

G. Certification<br />

1. The elevator manufacturer shall provide copies of all documents related to maintenance,<br />

safety, operations, design changes, modifications, retrofits, etc., which relate to any part,<br />

component, equipment, system, subsystem, or material <strong>and</strong> services applicable to the<br />

elevators provided.<br />

2. All of the above referenced shall be provided as it pertains to the original installation <strong>and</strong><br />

for a period of ten (10) years after final acceptance of the last elevators provided under<br />

any contract.<br />

3. The referenced material shall be provided within thirty (30) days of publication or<br />

internal distribution by the elevator manufacturer. The material, even if labeled<br />

PROPRIETARY, shall be delivered without prejudice or delay <strong>and</strong> at no additional cost.<br />

4. Provide all material on CD-ROM in a format approved by the Owner.<br />

H. MSDS <strong>and</strong> product data sheets: Shall be submitted with an index listing each product, along<br />

with the application method of the product, approximate quantity of product per elevator <strong>and</strong><br />

the component the product is applied to or associated with. The Installer shall allow 6 (six)<br />

weeks for review of MSDS.<br />

I. Senate Bill 1886 Submittals: Provide copies of all Code Authority/permit submittals.<br />

1.4 QUALITY ASSURANCE<br />

A. Regulatory agencies: elevator design, materials, construction clearances, workmanship, <strong>and</strong><br />

tests shall conform to the requirements of the codes <strong>and</strong> regulations listed in Part 1.5.<br />

B. Welding: Welding shall be performed in accordance with the requirements of AWS or CWB.<br />

Welders shall produce evidence of current certification by AWS or CWB.<br />

C. Requirements of Regulatory Agencies<br />

1. Installer shall obtain <strong>and</strong> pay for all necessary permits, <strong>and</strong> perform such tests as may be<br />

required for acceptance <strong>and</strong> approval of elevators by jurisdictional agencies.<br />

2. Installer shall notify the proper inspectors to witness required testing.<br />

D. Factory Visit<br />

1. The Installer shall provide for the costs of up to three of LAWA’s representatives to visit<br />

the factory where the elevators are being manufactured, per contract, per unit type.<br />

2. Installer shall not ship the elevator without the approval of LAWA’s representative after<br />

the conclusion of the factory visit.<br />

HEAVY DUTY TRANSIT TYPE MACHINE ROOM-LESS ELEVATORS<br />

14 21 00 - 4 Elevators, Escalators <strong>and</strong> Moving Walks

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!