12.02.2013 Views

Design and Construction Handbook - Los Angeles World Airports

Design and Construction Handbook - Los Angeles World Airports

Design and Construction Handbook - Los Angeles World Airports

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Norman Y. Mineta San José International Airport<br />

Scope of Services Draft<br />

7.1.4.3.3 Final review soils analysis/test boring report <strong>and</strong> establish<br />

foundation approach<br />

7.1.4.4 Mechanical<br />

7.1.4.4.1 Refine mechanical loads<br />

7.1.4.4.2 Confirm system <strong>and</strong> equipment selection, establish clearance<br />

requirements, equipment <strong>and</strong> chase locations<br />

7.1.4.4.3 Analyze energy conservation measures<br />

7.1.4.4.4 Coordinate loads with structural <strong>and</strong> electrical disciplines<br />

7.1.4.4.5 Size major duct lines<br />

7.1.4.4.6 Coordinate space requirements, clearances <strong>and</strong> visual impact<br />

Architectural<br />

7.1.4.4.7 Analyze acoustical <strong>and</strong> vibration requirements<br />

7.1.4.4.8 Develop diagrammatic fire protection <strong>and</strong> storm layouts<br />

7.1.4.4.9 Determine utility tie locations <strong>and</strong> routing<br />

7.1.4.5 Electrical<br />

7.1.4.5.1 Verify electrical loading requirements with lighting levels,<br />

mechanical equipment, elevator equipment, <strong>and</strong> other power<br />

needs<br />

7.1.4.5.2 Coordinate lighting layout with lighting designer, Architectural <strong>and</strong><br />

Interiors<br />

7.1.4.5.3 Establish equipment locations, shaft sizes <strong>and</strong> locations<br />

7.1.4.5.4 Requirements for the integration of the numerous controls <strong>and</strong><br />

special systems into the existing airport infrastructure for these<br />

systems<br />

7.1.4.5.5 Coordinate equipment loading, locations <strong>and</strong> space requirements<br />

with Mechanical, Civil, Structural, L<strong>and</strong>scaping, <strong>and</strong> Architectural<br />

disciplines.<br />

7.1.4.5.6 Determine utility tie locations <strong>and</strong> routing<br />

7.1.4.6 L<strong>and</strong>scaping<br />

7.1.4.6.1 <strong>Design</strong> areas requiring soft <strong>and</strong> hardscaping<br />

7.1.4.6.2 Develop plant list<br />

7.1.4.6.3 Establish hardscape components list<br />

7.1.4.6.4 Coordinate lighting <strong>and</strong> service furniture requirements with other<br />

disciplines <strong>and</strong> City<br />

7.1.4.7 Signage <strong>and</strong> Graphics<br />

7.1.4.7.1 Prepare Signage <strong>and</strong> Graphics program in accordance with City<br />

guidelines<br />

7.1.4.8 Interior <strong>Design</strong> <strong>and</strong> FF&E<br />

7.1.4.8.1 Develop interior design furnishing <strong>and</strong> equipment layouts.<br />

7.1.4.8.2 Develop sketches <strong>and</strong> construction details of special design<br />

features. Develop furniture <strong>and</strong> finishes list to identify final scope.<br />

7.1.4.9 Sustainable <strong>Design</strong><br />

7.1.4.9.1 Follow the requirements for implementing the U.S. Green Building<br />

Council's (USGBC) "Leadership in Energy <strong>and</strong> Environmental<br />

Revision G – 15 August 2006 CHAPTER III-01 - <strong>Design</strong> Tasks And Deliverables - 22

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!