• Update sprinkler layout.<br />

• Indicate St<strong>and</strong>pipe <strong>and</strong> Valve Locations<br />

Communication Drawings:<br />

a. Sheet Index<br />

b. Demolition Plan<br />

• With Survey Photos.<br />

c. Single Line Diagrams<br />

d. <strong>Construction</strong> Floor Plan<br />

• Indicate conduit sizes for all routes previously indicated.<br />

e. Typical Details<br />

• Connection Point Details at the MPOE <strong>and</strong> the dedicated utility room.<br />

• Details pertaining to any proposed roof mounted equipment.<br />

Security Drawings:<br />

a. Sheet Index<br />

b. Demolition Plan<br />

• With Survey Photos.<br />

c. Single Line Diagrams<br />

d. <strong>Construction</strong> Floor Plan<br />

e. Typical Details<br />

Additional Required Documents:<br />

a. Updated Cost Estimate<br />

b. Updated <strong>Construction</strong> Schedule<br />

c. Updated Site Logistics Plan<br />

d. Provide “Cut Sheets” for all proposed equipment<br />

e. Provide a Set of Outlines Specifications in CSI format <strong>and</strong> Basis of <strong>Design</strong><br />

Narrative.<br />

f. Updated LAWA submittal schedule<br />

g. Updated Constructability Review form<br />

1.21.2 <strong>Design</strong> Development Phase (60%) - For all LAWA projects, the <strong>Design</strong><br />

Development plans <strong>and</strong> specifications shall include all information in previous submittals<br />

plus all annotated comments from previous submittals <strong>and</strong> shall at a minimum indicate:<br />

1. Proposed l<strong>and</strong>scaping, exterior signing, exterior lighting, fencing or other site<br />

elements.<br />

2. Preliminary horizontal <strong>and</strong> vertical alignments for all roadways, drainage<br />

systems, <strong>and</strong> applicable exterior utilities tied into Airport coordinate system.<br />

3. Preliminary paving <strong>and</strong> parking layouts with horizontal <strong>and</strong> vertical ties to site<br />

survey <strong>and</strong> representative cross-sections.<br />

4. Preliminary Cost Estimates, <strong>Construction</strong> Schedule <strong>and</strong> Phasing Plans..<br />

<strong>Design</strong> <strong>and</strong> <strong>Construction</strong> H<strong>and</strong>book<br />

27 of 84<br />

H<strong>and</strong>book (Version 3) 01.15.11