Guide Specification<br />

7. NPS 6: 12 feet with 3/4-inch rod.<br />

8. NPS 8 to NPS 12: 12 feet with 7/8-inch rod.<br />

H. Install supports for vertical steel piping every 15 feet.<br />

I. Install hangers for stainless-steel piping with the following maximum horizontal spacing <strong>and</strong><br />

minimum rod diameters:<br />

1. NPS 2: 84 inches with 3/8-inch rod.<br />

2. NPS 3: 96 inches with 1/2-inch rod.<br />

3. NPS 4: 108 inches with 1/2-inch rod.<br />

4. NPS 6: 10 feet with 5/8-inch rod.<br />

J. Install supports for vertical stainless-steel piping every 10 feet.<br />

K. Install hangers for copper tubing with the following maximum horizontal spacing <strong>and</strong><br />

minimum rod diameters:<br />

1. NPS 1-1/4: 72 inches with 3/8-inch rod.<br />

2. NPS 1-1/2 <strong>and</strong> NPS 2: 96 inches with 3/8-inch rod.<br />

3. NPS 2-1/2: 108 inches with 1/2-inch rod.<br />

4. NPS 3 to NPS 5: 10 feet with 1/2-inch rod.<br />

5. NPS 6: 10 feet with 5/8-inch rod.<br />

6. NPS 8: 10 feet with 3/4-inch rod.<br />

L. Install supports for vertical copper tubing every 10 feet.<br />

M. Support piping <strong>and</strong> tubing not listed above according to MSS SP-69 <strong>and</strong> manufacturer's<br />

written instructions.<br />

3.5 SANITARY PIPING INSTALLATION<br />

A. Install backwater valves in building drain piping. For interior installation, provide cleanout<br />

deck plate flush with floor <strong>and</strong> centered over backwater valve cover, <strong>and</strong> of adequate size to<br />

remove valve cover for servicing.<br />

B. Install cleanouts in aboveground piping <strong>and</strong> building drain piping according to the following,<br />

unless otherwise indicated:<br />

1. Size same as drainage piping up to NPS 4. Use NPS 4 for larger drainage piping unless<br />

larger cleanout is indicated.<br />

2. Locate at each change in direction of piping greater than 45 degrees.<br />

3. Locate at minimum intervals of 50 feet for piping NPS 4 <strong>and</strong> smaller <strong>and</strong> 100 feet for<br />

larger piping.<br />

4. Locate at base of each vertical soil <strong>and</strong> waste stack.<br />

C. For floor cleanouts for piping below floors, install cleanout deck plates with top flush with<br />

finished floor.<br />

FACILITY SANITARY SEWERAGE<br />

22 13 00 - 19 Plumbing Systems