Guide Specification<br />

may mutually agree to extend the SA for an additional sixty (60) months, via a renewable<br />

option (“Option”).<br />

C. The Contract/Warranty, PM, Interim <strong>and</strong> SA services shall include all services necessary to<br />

maintain the equipment in proper working order for use at a major international airport<br />

including, but not limited to.<br />

1. “Tasks”:<br />

a. Inspection of completed installation <strong>and</strong> periodic testing to maintain elevators in<br />

completely operable, like new condition.<br />

b. Provide preventative maintenance on elevators for a minimum of four (4) hours<br />

each month (Total On-Site Time). Provide monthly documentation of the same to<br />

LAWA.<br />

c. Periodic lubrication of parts <strong>and</strong> equipment components as per OEM’s<br />

recommendation. Charts are to be provided for each elevator indicating when<br />

services are provided.<br />

d. Perform work without removing elevators from service during peak traffic periods<br />

determined by LAWA as 7:00 a.m. to 10:30 p.m. daily.<br />

e. Provide twenty (24) hour emergency service during the maintenance period<br />

consisting of a prompt response (within 30 minutes) to emergency request by<br />

telephone or otherwise from LAWA or designated representative if an elevator is<br />

inoperable or in case of injury, entrapment, or potential injury to persons.<br />

f. Unlimited regular time callbacks are included with a required response time of one<br />

(1) hour. Regular time will be Monday through Friday, 8:00am to 4:30pm,<br />

exclusive of holidays. Overtime\Premium time call backs originating from an<br />

operational error related to the performance requirements of the equipment shall be<br />

borne by the Contractor.<br />

g. All other services as required by Section 14 20 00, 3.7.2 <strong>and</strong> Exhibit A.<br />

1.7 EXTENDED PREVENTATIVE AND ROUTINE MAINTENANCE SERVICE<br />

AGREEMENT<br />

A. The Contractor shall perform the SA (including all tasks listed herein <strong>and</strong> in Exhibit A) for a<br />

period of sixty (60) months from the date of Elevator Warranty expiration, or one year after the<br />

Contract Completion Date, whichever is later. A Faithful Performance Bond <strong>and</strong> a Payment<br />

Bond (“SA Bonds”), each for 100 percent of the contract price for the SA shall be submitted for<br />

LAWA approval no less than 30 days prior to Contract Completion Date. The SA Bonds shall<br />

be submitted to the City Attorney for approval as to form.<br />

HEAVY DUTY TRANSIT TYPE MACHINE ROOM-LESS ELEVATORS<br />

14 21 00 - 6 Elevators, Escalators <strong>and</strong> Moving Walks