12.02.2013 Views

Design and Construction Handbook - Los Angeles World Airports

Design and Construction Handbook - Los Angeles World Airports

Design and Construction Handbook - Los Angeles World Airports

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Guide Specification<br />

D. Check <strong>and</strong> record performance of chiller protection devices.<br />

E. Check <strong>and</strong> record performance of chilled <strong>and</strong> condenser water flow <strong>and</strong> low temperature<br />

interlocks.<br />

F. Operate chiller for run in period as recommended by manufacturer.<br />

G. Check static deflection of vibration isolators, including deflection during chiller startup <strong>and</strong><br />

shutdown.<br />

3.7 CLEANING<br />

1. Check refrigerant charge. Check oil level.<br />

A. After completion of system installation, start up, testing <strong>and</strong> prior to commissioning,<br />

completely <strong>and</strong> thoroughly clean up the chillers from any foreign material <strong>and</strong> construction<br />

dirt <strong>and</strong> dust.<br />

END OF SECTION 23 64 11<br />

PACKAGED WATER CHILLERS – RECIPROCATING, SCROLL, AND SCREW<br />

23 64 11 - 10 Mechanical Systems

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!