Design and Construction Handbook - Los Angeles World Airports
Design and Construction Handbook - Los Angeles World Airports
Design and Construction Handbook - Los Angeles World Airports
- TAGS
- handbook
- airports
- www.lawa.org
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Guide Specification<br />
3.7 ADJUSTING<br />
4. Finish welds at exposed connections so no roughness shows after finishing <strong>and</strong> contours<br />
of welded surfaces match adjacent contours.<br />
A. Hanger Adjustments: Adjust hangers to distribute loads equally on attachments <strong>and</strong> to achieve<br />
indicated slope of pipe.<br />
B. Trim excess length of continuous-thread hanger <strong>and</strong> support rods to 1-1/2 inches.<br />
3.8 FIELD QUALITY CONTROL<br />
A. All tests shall be in accordance with city of <strong>Los</strong> <strong>Angeles</strong> <strong>and</strong> Inspector of Record.<br />
END OF SECTION 22 05 29<br />
HANGERS AND SUPPORTS FOR PLUMBING AND EQUIPMENT<br />
22 05 29 - 16 Plumbing Systems
Guide Specification N. Spring supported factory fabricated structural steel bases: Provide for vertical booster pumps suspended from floor slab above <strong>and</strong> through penetration. 1. Provide equipment rigidly bolted to spring supported reinforced structural base <strong>and</strong> isolated from suitable framed structural supports erected from floor slab. 2. Provide reinforced structural steel base constructed with structural members having depth of section not less than 1/12 span between spring mountings <strong>and</strong> supplied by vibration control manufacturer. 3. Provide a framed base to permit removal of any pump mounted on structural base. 4. Provide structural supports erected from floor slab, sized <strong>and</strong> framed to accept spring mountings <strong>and</strong> supported loads. 5. Piping in projected area of isolated structural pump base may be rigidly supported from isolated pump base. 6. Provide spring mountings designed so that they are capable of supporting equipment at fixed elevation during installation, <strong>and</strong> adjusted to provide operating clearance in mountings of 1/4 inch. O. Center of gravity (C.G.) mounted spring inertia blocks: 1. Equipment <strong>and</strong> its driving motor shall be integrally mounted on spring-supported concrete inertia blocks. 2. Provide inertia blocks sized to provide sufficient mass so that dynamic movement of equipment block assembly will be less than 1/16 inch peak-to-peak at any connection flange. Form shall be as noted for foundations. 3. Provide blocks <strong>and</strong> spring mountings arranged to accomplish dynamically symmetrical system with respect to total C.G. of spring assembly in all three major axes. 4. Provide steel spring mountings consisting of bare stable springs arranged in pendulum configuration with built-in adjustable side snubbers, leveling device <strong>and</strong> 1/4 inch thick neoprene acoustical base pad. 5. Provide mountings with a minimum static deflection corresponding to isolation efficiency of 90% at lowest equipment operating speed. 3.6 METAL FABRICATIONS A. Cut, drill, <strong>and</strong> fit miscellaneous metal fabrications for trapeze pipe hangers <strong>and</strong> equipment supports. B. Fit exposed connections together to form hairline joints. Field weld connections that cannot be shop welded because of shipping size limitations. C. Field Welding: Comply with AWS D1.1 procedures for shielded metal arc welding, appearance <strong>and</strong> quality of welds, <strong>and</strong> methods used in correcting welding work, <strong>and</strong> with the following: 1. Use materials <strong>and</strong> methods that minimize distortion <strong>and</strong> develop strength <strong>and</strong> corrosion resistance of base metals. 2. Obtain fusion without undercut or overlap. 3. Remove welding flux immediately. HANGERS AND SUPPORTS FOR PLUMBING AND EQUIPMENT 22 05 29 - 15 Plumbing Systems
Guide Specification 3.7 ADJUSTING 4. Finish welds at exposed connections so no roughness shows after finishing <strong>and</strong> contours of welded surfaces match adjacent contours. A. Hanger Adjustments: Adjust hangers to distribute loads equally on attachments <strong>and</strong> to achieve indicated slope of pipe. B. Trim excess length of continuous-thread hanger <strong>and</strong> support rods to 1-1/2 inches. 3.8 FIELD QUALITY CONTROL A. All tests shall be in accordance with city of <strong>Los</strong> <strong>Angeles</strong> <strong>and</strong> Inspector of Record. END OF SECTION 22 05 29 HANGERS AND SUPPORTS FOR PLUMBING AND EQUIPMENT 22 05 29 - 16 Plumbing Systems
- Page 1 and 2:
Design and Construction Handbook Ap
- Page 3 and 4:
1.31.6 Utilities 1.31.7 Product, Ma
- Page 5 and 6:
22.11.00 Facility Water Distributio
- Page 7 and 8:
Supplemental Drawings (To be issued
- Page 9 and 10:
1.0 General Requirements 1.1 Scope,
- Page 11 and 12:
inclusive of all information availa
- Page 13 and 14:
The 2008 Los Angeles Electrical Cod
- Page 15 and 16:
Design and Construction Handbook 15
- Page 17 and 18:
1.15 Tenant Projects Approvals - Te
- Page 19 and 20:
Issues Addressed Design Impacts to
- Page 21 and 22:
e responsible for assisting in the
- Page 23 and 24:
c. Egress Plan • Update Occupant
- Page 25 and 26:
• Locate and identify employee ch
- Page 27 and 28:
• Update sprinkler layout. • In
- Page 29 and 30:
g. Zone Plan (if required). • Ind
- Page 31 and 32:
• Identify all primary materials
- Page 33 and 34:
• Locate all receptacles • Loca
- Page 35 and 36:
3. Final Construction schedule, inc
- Page 37 and 38:
Design and Construction Handbook 37
- Page 39 and 40:
Mechanical Drawings: a. Sheet Index
- Page 41 and 42:
Communication Drawings: a. Sheet In
- Page 43 and 44:
• Make certain that the signature
- Page 45 and 46:
1. Piping shall be coordinated with
- Page 47 and 48:
other facilities. Constantly secure
- Page 49 and 50:
d. The face of the barricade expose
- Page 51 and 52:
e) No unapproved signage such as wa
- Page 53 and 54:
Design and Construction Handbook 53
- Page 55 and 56:
1.31.6 Utilities A. Pursuant to Sec
- Page 57 and 58:
Utility Shutdowns A. Utility shutdo
- Page 59 and 60:
Deviations: The Submittals shall cl
- Page 61 and 62:
miscellaneous items, as included he
- Page 63 and 64:
5) The Contractor shall comply with
- Page 65 and 66:
1. Sediments or other surface water
- Page 67 and 68:
Temporary Light, Power, Water, and
- Page 69 and 70:
equirements listed and any other re
- Page 71 and 72:
unauthorized persons to Airport-res
- Page 73 and 74:
C. The Contractor shall notify the
- Page 75 and 76:
E. All materials, parts, and equipm
- Page 77 and 78:
N. See appendix B for typical items
- Page 79 and 80:
or other characteristics, including
- Page 81 and 82:
Design and Construction Handbook 81
- Page 83:
GUIDE SPECIFICATIONS INTRODUCTION I
- Page 86 and 87:
Guide Specification bolts, and item
- Page 88 and 89:
Guide Specification 2. Wall Bracket
- Page 90 and 91:
Guide Specification 3.4 METAL BASE
- Page 92 and 93:
Guide Specification 1.5 CLOSEOUT SU
- Page 94 and 95:
Guide Specification 2.3 ILLUMINATIO
- Page 96 and 97:
Guide Specification B. Glass Column
- Page 98 and 99:
Guide Specification SECTION 06 40 2
- Page 100 and 101:
Guide Specification humidity at lev
- Page 102 and 103:
Guide Specification B. Solid-Surfac
- Page 104 and 105:
Guide Specification SECTION 08 11 1
- Page 106 and 107:
Guide Specification 1.4 DELIVERY, S
- Page 108 and 109:
Guide Specification 7. Exit Device
- Page 110 and 111:
Guide Specification a. Three anchor
- Page 112 and 113:
Guide Specification hardware. Facto
- Page 114 and 115:
Guide Specification 3.2 ADJUSTING A
- Page 116 and 117:
Guide Specification 1.3 INFORMATION
- Page 118 and 119:
Guide Specification a. Welded Steel
- Page 120 and 121:
Guide Specification b. Stud-Wall Ty
- Page 122 and 123:
Guide Specification B. Stainless-St
- Page 124 and 125:
Guide Specification B. Examine roug
- Page 126 and 127:
Guide Specification D. Glazing: Ins
- Page 128 and 129:
Guide Specification DOOR HARDWARE 0
- Page 130 and 131:
Guide Specification 1.5 COORDINATIO
- Page 132 and 133:
Guide Specification 2.2 HINGING MET
- Page 134 and 135:
Guide Specification 1. 1100 Series
- Page 136 and 137:
Guide Specification B. Size: Furnis
- Page 138 and 139:
Guide Specification 1. All modifica
- Page 140 and 141:
Guide Specification SECTION 09 22 1
- Page 142 and 143:
Guide Specification a. Diameter: 1/
- Page 144 and 145:
Guide Specification NOTE: On the dr
- Page 146 and 147:
Guide Specification 3.5 INSTALLING
- Page 148 and 149:
GYPSUM BOARD 09 29 00 - 1 Guide Spe
- Page 150 and 151:
Guide Specification NOTE: d. On the
- Page 152 and 153:
GYPSUM BOARD 09 29 00 - 5 Guide Spe
- Page 154 and 155:
GYPSUM BOARD 09 29 00 - 7 Guide Spe
- Page 156 and 157:
GYPSUM BOARD 09 29 00 - 9 Guide Spe
- Page 158 and 159:
Guide Specification 1. Locate sampl
- Page 160 and 161:
Guide Specification 2. Latex Additi
- Page 162 and 163:
Guide Specification F. Movement (Ex
- Page 164 and 165:
Guide Specification c. Immediately
- Page 166 and 167:
Guide Specification SECTION 09 51 1
- Page 168 and 169:
Guide Specification Testing of Vola
- Page 170 and 171:
Guide Specification SECTION 09 66 1
- Page 172 and 173:
Guide Specification 1. Build mockup
- Page 174 and 175:
Guide Specification D. Control-Join
- Page 176 and 177:
Guide Specification B. Installation
- Page 178 and 179:
Guide Specification SECTION 09 66 2
- Page 180 and 181:
Guide Specification 1.6 PROTECTION
- Page 182 and 183:
Guide Specification 1. Sizes shall
- Page 184 and 185:
Guide Specification NOTE: the mix d
- Page 186 and 187:
Guide Specification 4. Curing: Allo
- Page 188 and 189:
Guide Specification 1. Probe Manufa
- Page 190 and 191:
Guide Specification b. Stop Strips:
- Page 192 and 193:
Guide Specification thoroughly. App
- Page 194 and 195:
Guide Specification 1. Each carpet
- Page 196 and 197:
Guide Specification F. Density: Gre
- Page 198 and 199:
Guide Specification C. Butt carpet
- Page 200 and 201:
Guide Specification 4. Mitered Carp
- Page 202 and 203:
Guide Specification 4. Mannington 5
- Page 204 and 205:
Guide Specification characteristics
- Page 206 and 207:
Guide Specification END OF SECTION
- Page 208 and 209:
Guide Specification 4. ICI Paints 5
- Page 210 and 211:
Guide Specification 3.3 APPLICATION
- Page 212 and 213:
SIGNAGE 10 14 23 - 1 Guide Specific
- Page 214 and 215:
SIGNAGE 10 14 23 - 3 Guide Specific
- Page 216 and 217:
SIGNAGE 10 14 23 - 5 Guide Specific
- Page 218 and 219:
SIGNAGE 10 14 23 - 7 Guide Specific
- Page 220 and 221:
SIGNAGE 10 14 23 - 9 Guide Specific
- Page 222 and 223:
SIGNAGE 10 14 23 - 11 Guide Specifi
- Page 224 and 225:
SIGNAGE 10 14 23 - 13 Guide Specifi
- Page 226 and 227:
SIGNAGE 10 14 23 - 15 Guide Specifi
- Page 228 and 229:
SIGNAGE 10 14 23 - 17 Guide Specifi
- Page 230 and 231:
Guide Specification SECTION 10 21 1
- Page 232 and 233:
Guide Specification END OF SECTION
- Page 234 and 235:
2.2 CORNER GUARDS A. Surface-Mounte
- Page 236 and 237:
2. Provide full height units. Do no
- Page 238 and 239:
Guide Specification 1.4 COORDINATIO
- Page 240 and 241:
Guide Specification 2. Mounting: Fl
- Page 242 and 243:
Guide Specification 2.6 CUSTODIAL A
- Page 244 and 245:
Guide Specification 1. Review metho
- Page 246 and 247:
Guide Specification B. Cabinet Door
- Page 248 and 249:
Guide Specification SECTION 10 44 1
- Page 250 and 251:
Guide Specification 1. Shelf: Same
- Page 252 and 253:
Guide Specification 3.3 INSTALLATIO
- Page 254 and 255:
Guide Specification 1.7 WARRANTY A.
- Page 256 and 257:
Guide Specification SECTION 12 24 1
- Page 258 and 259:
Guide Specification H. Shade Cloth
- Page 260 and 261:
Guide Specification 4. The braking
- Page 262 and 263:
Guide Specification d. Multiple "su
- Page 264 and 265:
Guide Specification SECTION 14 20 0
- Page 266 and 267:
Guide Specification c. Single-phase
- Page 268 and 269:
Guide Specification a. Clear, plumb
- Page 270 and 271:
Guide Specification j. Single phase
- Page 272 and 273:
Guide Specification 3. All electric
- Page 274 and 275:
Guide Specification when copies of
- Page 276 and 277:
Guide Specification 15) Safeties: C
- Page 278 and 279:
Guide Specification safety devices
- Page 280 and 281:
Guide Specification LAWA. This serv
- Page 282 and 283:
Guide Specification 1) Replace: Rep
- Page 284 and 285:
Guide Specification 2.1 MATERIALS A
- Page 286 and 287:
Guide Specification A. General: On
- Page 288 and 289:
Guide Specification SECTION 14 21 0
- Page 290 and 291:
Guide Specification 2. Samples shal
- Page 292 and 293:
Guide Specification 1.5 DELIVERY, S
- Page 294 and 295:
Guide Specification B. Optional Sec
- Page 296 and 297:
Guide Specification L. Baked Enamel
- Page 298 and 299:
Guide Specification Car and Hoistwa
- Page 300 and 301:
Guide Specification C. Door Control
- Page 302 and 303:
Guide Specification O. Terminal Lim
- Page 304 and 305:
Guide Specification 2. Include as a
- Page 306 and 307:
Guide Specification d. Elevator dep
- Page 308 and 309:
Guide Specification 3. Protect car
- Page 310 and 311:
Guide Specification a minimum dimen
- Page 312 and 313:
Guide Specification F. Hall Lantern
- Page 314 and 315:
Guide Specification seconds. Upon e
- Page 316 and 317:
Guide Specification 9. All cabinets
- Page 318 and 319:
Guide Specification C. Re-Inspectio
- Page 320 and 321:
Guide Specification D. Step/Skirt P
- Page 322 and 323:
Guide Specification K. Operation an
- Page 324 and 325:
Guide Specification A. Installer Qu
- Page 326 and 327:
Guide Specification 2.2 MATERIALS A
- Page 328 and 329:
Guide Specification 3. Brake Operat
- Page 330 and 331:
Guide Specification a. The motor co
- Page 332 and 333:
Guide Specification 5. Step Tracks:
- Page 334 and 335:
Guide Specification ends. Plates sh
- Page 336 and 337:
Guide Specification building change
- Page 338 and 339:
Guide Specification 35) Pit high wa
- Page 340 and 341:
Guide Specification 3.4 DEMONSTRATI
- Page 342 and 343:
Guide Specification 1.4 QUALITY ASS
- Page 344 and 345:
Guide Specification a. Tools may be
- Page 346 and 347:
Guide Specification 1.6 JOB CONDITI
- Page 348 and 349:
Guide Specification C. Oil Drip Pan
- Page 350 and 351:
Guide Specification G. Landing Floo
- Page 352 and 353:
Guide Specification 1. Provide each
- Page 354 and 355:
Guide Specification 1. Per Referenc
- Page 356 and 357:
Guide Specification 1. Emergency St
- Page 358 and 359:
Guide Specification F. Width: 56" (
- Page 360 and 361: Guide Specification PART 2 - PRODUC
- Page 362 and 363: Guide Specification PART 3 - EXECUT
- Page 364 and 365: Guide Specification SECTION 21 05 1
- Page 366 and 367: Guide Specification 4. Joint: As sp
- Page 368 and 369: Guide Specification 3.2 MANUFACTURE
- Page 370 and 371: Guide Specification PART 2 - PRODUC
- Page 372 and 373: Guide Specification SECTION 21 13 1
- Page 374 and 375: Guide Specification 2.2 PIPING SPEC
- Page 376 and 377: Guide Specification SECTION 21 13 1
- Page 378 and 379: Guide Specification 1. Type: Standa
- Page 380 and 381: Guide Specification SECTION 21 22 0
- Page 382 and 383: 2.4 VALVES Guide Specification a. M
- Page 384 and 385: Guide Specification B. Manual Relea
- Page 386 and 387: Guide Specification 3.3 CLEAN-AGENT
- Page 388 and 389: Guide Specification 1.3 SUBMITTALS
- Page 390 and 391: Guide Specification C. 2-1/2 inches
- Page 392 and 393: Guide Specification 2.5 BUTTERFLY V
- Page 394 and 395: Guide Specification 3.3 GENERAL REQ
- Page 396 and 397: Guide Specification SECTION 22 05 2
- Page 398 and 399: Guide Specification 1. Hangers for
- Page 400 and 401: Guide Specification 2.9 FIRESTOPPIN
- Page 402 and 403: Guide Specification 2.13 PIPE POSIT
- Page 404 and 405: Guide Specification 20. Pipe Roll a
- Page 406 and 407: Guide Specification auxiliary stops
- Page 408 and 409: Guide Specification d. NPS 8 to NPS
- Page 412 and 413: Guide Specification SECTION 22 05 4
- Page 414 and 415: Guide Specification 1. Mass: Minimu
- Page 416 and 417: Guide Specification a. 0.750 inch m
- Page 418 and 419: Guide Specification 2.5 SEISMIC RES
- Page 420 and 421: Guide Specification D. Install spri
- Page 422 and 423: Guide Specification H. Drilled-in A
- Page 424 and 425: Guide Specification SECTION 22 05 5
- Page 426 and 427: 2.3 STENCILS Guide Specification c.
- Page 428 and 429: Guide Specification B. Valve Lockou
- Page 430 and 431: Guide Specification 2. Near each br
- Page 432 and 433: Guide Specification SECTION 22 07 0
- Page 434 and 435: Guide Specification C. Mockups: Bef
- Page 436 and 437: Guide Specification H. TYPE P-8: AS
- Page 438 and 439: Guide Specification E. Closed Cell
- Page 440 and 441: Guide Specification D. Mineral Fibe
- Page 442 and 443: Guide Specification 3. Service Temp
- Page 444 and 445: Guide Specification C. Woven Polyes
- Page 446 and 447: Guide Specification C. Stainless-St
- Page 448 and 449: Guide Specification N. Heat Traced
- Page 450 and 451: Guide Specification PIPING SYSTEM D
- Page 452 and 453: Guide Specification SECTION 22 11 0
- Page 454 and 455: Guide Specification 1. Mechanical-J
- Page 456 and 457: Guide Specification B. Remote Regis
- Page 458 and 459: Guide Specification 3. Stem: Copper
- Page 460 and 461:
Guide Specification a. Watts. b. Zu
- Page 462 and 463:
Guide Specification C. Refrigerator
- Page 464 and 465:
Guide Specification 3. Refrigerator
- Page 466 and 467:
Guide Specification SECTION 22 13 0
- Page 468 and 469:
Guide Specification PART 2 - PRODUC
- Page 470 and 471:
Guide Specification 2.3 SANITARY SE
- Page 472 and 473:
Guide Specification 1. Copper Pipin
- Page 474 and 475:
Guide Specification 13. Type, for E
- Page 476 and 477:
Guide Specification B. Cast Iron: A
- Page 478 and 479:
Guide Specification 1. Structural D
- Page 480 and 481:
Guide Specification D. Keep open en
- Page 482 and 483:
Guide Specification sanitary sewer
- Page 484 and 485:
Guide Specification 7. NPS 6: 12 fe
- Page 486 and 487:
Guide Specification Q. Install expa
- Page 488 and 489:
Guide Specification END OF SECTION
- Page 490 and 491:
Guide Specification B. Manufacturer
- Page 492 and 493:
Guide Specification B. Ductile-Iron
- Page 494 and 495:
Guide Specification 2.6 STORM WATER
- Page 496 and 497:
Guide Specification C. Area Drain (
- Page 498 and 499:
Guide Specification C. Cover shall
- Page 500 and 501:
Guide Specification 1. Power failur
- Page 502 and 503:
Guide Specification 1. Galvanized s
- Page 504 and 505:
Guide Specification 3. Multiple, St
- Page 506 and 507:
Guide Specification 1. Lead Sheets:
- Page 508 and 509:
Guide Specification SECTION 22 31 0
- Page 510 and 511:
Guide Specification b. Everpure, In
- Page 512 and 513:
Guide Specification PART 2 - PRODUC
- Page 514 and 515:
Guide Specification SECTION 22 34 0
- Page 516 and 517:
Guide Specification 1. Rheem. 2. A.
- Page 518 and 519:
Guide Specification a. Thermometer
- Page 520 and 521:
Guide Specification E. Shop Drawing
- Page 522 and 523:
Guide Specification a. J.R. Smith.
- Page 524 and 525:
Guide Specification 1. Sloan. 2. Ch
- Page 526 and 527:
Guide Specification pitched to drai
- Page 528 and 529:
2.9 MOP SINKS Guide Specification A
- Page 530 and 531:
Guide Specification I. Install wate
- Page 532 and 533:
Guide Specification SECTION 22 70 0
- Page 534 and 535:
Guide Specification PART 2 - PRODUC
- Page 536 and 537:
Guide Specification B. Product Desc
- Page 538 and 539:
Guide Specification B. Manufacturer
- Page 540 and 541:
Guide Specification 6. Ends: Thread
- Page 542 and 543:
Guide Specification D. Gas safety s
- Page 544 and 545:
Guide Specification E. One-Piece, S
- Page 546 and 547:
Guide Specification C. Install gas
- Page 548 and 549:
Guide Specification e. Piping in Eq
- Page 550 and 551:
Guide Specification B. Install hang
- Page 552 and 553:
Guide Specification C. Source Quali
- Page 554 and 555:
Guide Specification h. Insert 2 cop
- Page 556 and 557:
Guide Specification D. Access to Eq
- Page 558 and 559:
Guide Specification and frames shal
- Page 560 and 561:
Guide Specification 4. Purge all ai
- Page 562 and 563:
Guide Specification B. Product Data
- Page 564 and 565:
Guide Specification 2.3 ACCESSORIES
- Page 566 and 567:
Guide Specification PART 2 - PRODUC
- Page 568 and 569:
Guide Specification 1. Manufacturer
- Page 570 and 571:
Guide Specification 3.3 CHILLED-WAT
- Page 572 and 573:
Guide Specification SECTION 23 05 2
- Page 574 and 575:
Guide Specification D. Design Data:
- Page 576 and 577:
Guide Specification C. Low-Type, Si
- Page 578 and 579:
Guide Specification 2.11 FIRESTOPPI
- Page 580 and 581:
Guide Specification C. Construct su
- Page 582 and 583:
Guide Specification SECTION 23 05 4
- Page 584 and 585:
Guide Specification C. Restrained S
- Page 586 and 587:
Guide Specification 2.3 DUCTWORK LA
- Page 588 and 589:
Guide Specification 3. Wedge Anchor
- Page 590 and 591:
Guide Specification PART 2 - PRODUC
- Page 592 and 593:
Guide Specification 2. Brady. 3. Ko
- Page 594 and 595:
Guide Specification 3.2 INSTALLATIO
- Page 596 and 597:
Guide Specification drawings with a
- Page 598 and 599:
Guide Specification B. Permanently
- Page 600 and 601:
Guide Specification D. Measure, adj
- Page 602 and 603:
Guide Specification c. Size/model d
- Page 604 and 605:
Guide Specification k. Discharge pr
- Page 606 and 607:
Guide Specification h. Minimum desi
- Page 608 and 609:
Guide Specification 18. ASTM C1136
- Page 610 and 611:
Guide Specification H. TYPE P-8: AS
- Page 612 and 613:
Guide Specification 2. Density: 1.5
- Page 614 and 615:
Guide Specification b. Pittsburgh C
- Page 616 and 617:
Guide Specification 1. Insulate ent
- Page 618 and 619:
Guide Specification P. Prepare pipe
- Page 620 and 621:
Guide Specification G. Equipment in
- Page 622 and 623:
Guide Specification Transfer Air Du
- Page 624 and 625:
Guide Specification SECTION 23 08 0
- Page 626 and 627:
Guide Specification 1.7 COMMISSIONI
- Page 628 and 629:
Guide Specification 2. Piping syste
- Page 630 and 631:
Guide Specification 1. Test heating
- Page 632 and 633:
Guide Specification 4. System confi
- Page 634 and 635:
Guide Specification 2.2 OPERATOR WO
- Page 636 and 637:
Guide Specification 6. Record, eval
- Page 638 and 639:
Guide Specification 5. Add, delete,
- Page 640 and 641:
Guide Specification 6. Data reports
- Page 642 and 643:
Guide Specification a. Start. b. Op
- Page 644 and 645:
Guide Specification 2. Base on occu
- Page 646 and 647:
Guide Specification 1. Calculate ou
- Page 648 and 649:
Guide Specification PART 3 - EXECUT
- Page 650 and 651:
Guide Specification 1.3 SYSTEM DESC
- Page 652 and 653:
Guide Specification 1. Fittings: AS
- Page 654 and 655:
Guide Specification D. Sleeve pipe
- Page 656 and 657:
Guide Specification PIPE SIZE Inche
- Page 658 and 659:
Guide Specification B. Type: Horizo
- Page 660 and 661:
Guide Specification SECTION 23 23 0
- Page 662 and 663:
Guide Specification B. Line Test Pr
- Page 664 and 665:
Guide Specification 2.4 REFRIGERANT
- Page 666 and 667:
Guide Specification 3. Sporlan Valv
- Page 668 and 669:
Guide Specification B. Internal Dia
- Page 670 and 671:
Guide Specification 2. When receive
- Page 672 and 673:
Guide Specification SECTION 23 25 0
- Page 674 and 675:
Guide Specification 1. Water meters
- Page 676 and 677:
Guide Specification 5. High or low
- Page 678 and 679:
Guide Specification C. Provide glyc
- Page 680 and 681:
Guide Specification source and allo
- Page 682 and 683:
Guide Specification Metal and Flexi
- Page 684 and 685:
Guide Specification 3. AWS D9.1M/D9
- Page 686 and 687:
Guide Specification 1. Ducts up to
- Page 688 and 689:
Guide Specification 7. Maximum Stat
- Page 690 and 691:
Guide Specification D. Unless other
- Page 692 and 693:
Guide Specification 8. Unconditione
- Page 694 and 695:
3.9 PAINTING Guide Specification A.
- Page 696 and 697:
3.12 START UP Guide Specification 2
- Page 698 and 699:
Guide Specification a. Pressure Cla
- Page 700 and 701:
Guide Specification a. Rectangular
- Page 702 and 703:
Guide Specification 2. UL 555C - St
- Page 704 and 705:
Guide Specification 9. 90-degree st
- Page 706 and 707:
Guide Specification B. Fabrication:
- Page 708 and 709:
Guide Specification 3. Operator: Mi
- Page 710 and 711:
Guide Specification F. Bearings: 1.
- Page 712 and 713:
Guide Specification h. Upstream and
- Page 714 and 715:
Guide Specification 3.2 NSTALLATION
- Page 716 and 717:
Guide Specification 1.3 SUBMITTALS
- Page 718 and 719:
Guide Specification C. Sheaves: Cas
- Page 720 and 721:
Guide Specification SECTION 23 36 0
- Page 722 and 723:
Guide Specification H. Hot Water He
- Page 724 and 725:
Guide Specification SECTION 23 37 0
- Page 726 and 727:
Guide Specification 2.5 CEILING SUP
- Page 728 and 729:
Guide Specification D. Fabrication:
- Page 730 and 731:
Guide Specification SECTION 23 40 0
- Page 732 and 733:
Guide Specification C. Media: UL 90
- Page 734 and 735:
Guide Specification 9. An integral
- Page 736 and 737:
Guide Specification 1.4 WARRANTY in
- Page 738 and 739:
Guide Specification SECTION 23 64 1
- Page 740 and 741:
Guide Specification PART 2 - PRODUC
- Page 742 and 743:
Guide Specification B. Coil Guard:
- Page 744 and 745:
Guide Specification C. Install the
- Page 746 and 747:
Guide Specification E. If chiller a
- Page 748 and 749:
Guide Specification SECTION 23 64 1
- Page 750 and 751:
Guide Specification 1.4 WARRANTY c.
- Page 752 and 753:
Guide Specification motor and motor
- Page 754 and 755:
Guide Specification 1. Type: R-134a
- Page 756 and 757:
Guide Specification C. Designed to
- Page 758 and 759:
Guide Specification C. Enclosure: U
- Page 760 and 761:
Guide Specification 12. Total power
- Page 762 and 763:
Guide Specification E. Manually Res
- Page 764 and 765:
Guide Specification sagging. D. Too
- Page 766 and 767:
Guide Specification mechanical coup
- Page 768 and 769:
Guide Specification 3.7 COMMISSIONI
- Page 770 and 771:
Guide Specification SECTION 23 65 0
- Page 772 and 773:
Guide Specification 7. Fan airflow,
- Page 774 and 775:
Guide Specification 1. Material: St
- Page 776 and 777:
Guide Specification GUARANTEED MINI
- Page 778 and 779:
Guide Specification 4. Handrail: St
- Page 780 and 781:
Guide Specification h. Verify prope
- Page 782 and 783:
Guide Specification 1. NEMA MG 1 -
- Page 784 and 785:
Guide Specification 1. Zinc chromat
- Page 786 and 787:
2.5 COILS Guide Specification A. Ca
- Page 788 and 789:
Guide Specification d. Axles: Minim
- Page 790 and 791:
Guide Specification Method for Test
- Page 792 and 793:
Guide Specification END OF SECTION
- Page 794 and 795:
Guide Specification 4. Rough-in con
- Page 796 and 797:
Guide Specification K. Air Filters:
- Page 798 and 799:
Guide Specification 3.3 MANUFACTURE
- Page 800 and 801:
Guide Specification f. National Fir
- Page 802 and 803:
Guide Specification 32. Resistive L
- Page 804 and 805:
Guide Specification 1.6 MAINTENANCE
- Page 806 and 807:
Guide Specification deems a critica
- Page 808 and 809:
Guide Specification 1. Hubbell. 2.
- Page 810 and 811:
Guide Specification SECTION 26 05 1
- Page 812 and 813:
Guide Specification B. Location: In
- Page 814 and 815:
Guide Specification B. Inspect cabl
- Page 816 and 817:
Guide Specification 3.1 CONDUCTOR A
- Page 818 and 819:
Guide Specification SECTION 26 05 1
- Page 820 and 821:
Guide Specification 2.3 TERMINATION
- Page 822 and 823:
Guide Specification SECTION 26 05 2
- Page 824 and 825:
Guide Specification 2.1 ROD ELECTRO
- Page 826 and 827:
Guide Specification J. Install from
- Page 828 and 829:
Guide Specification 1.3 DEFINITIONS
- Page 830 and 831:
Guide Specification damage, by stor
- Page 832 and 833:
Guide Specification 5. Mechanical F
- Page 834 and 835:
Guide Specification spring lock was
- Page 836 and 837:
Guide Specification A. Clean adjace
- Page 838 and 839:
Guide Specification F. In Slab Abov
- Page 840 and 841:
Guide Specification 2. Allied Tube
- Page 842 and 843:
Guide Specification 1. Material: Ga
- Page 844 and 845:
Guide Specification U. Install suit
- Page 846 and 847:
Guide Specification SECTION 26 05 3
- Page 848 and 849:
Guide Specification B. Product Desc
- Page 850 and 851:
Guide Specification SECTION 26 05 4
- Page 852 and 853:
Guide Specification 1.6 PROJECT CON
- Page 854 and 855:
Guide Specification C. Design and f
- Page 856 and 857:
Guide Specification clean surfaces
- Page 858 and 859:
Guide Specification with structural
- Page 860 and 861:
Guide Specification 3.4 MANHOLE AND
- Page 862 and 863:
Guide Specification SECTION 26 05 4
- Page 864 and 865:
Guide Specification PART 2 - PRODUC
- Page 866 and 867:
Guide Specification D. Holes for Ex
- Page 868 and 869:
Guide Specification SECTION 26 05 5
- Page 870 and 871:
Guide Specification voltage between
- Page 872 and 873:
Guide Specification locations. 6. I
- Page 874 and 875:
Guide Specification 1.2 REFERENCES
- Page 876 and 877:
Guide Specification 1.4 SUBMITTALS
- Page 878 and 879:
Guide Specification 1.5 QUALITY ASS
- Page 880 and 881:
Guide Specification B. Arc fault ha
- Page 882 and 883:
Guide Specification description of
- Page 884 and 885:
Guide Specification equipment for t
- Page 886 and 887:
Guide Specification 3.7 MANUFACTURE
- Page 888 and 889:
Guide Specification and type of swi
- Page 890 and 891:
Guide Specification 1. Cover Mounte
- Page 892 and 893:
Guide Specification 2. Separate tri
- Page 894 and 895:
Guide Specification SECTION 26 09 4
- Page 896 and 897:
Guide Specification D. Provide 2 ex
- Page 898 and 899:
Guide Specification 5. The DTC shal
- Page 900 and 901:
Guide Specification 3.2 DOCUMENTATI
- Page 902 and 903:
Guide Specification SECTION 26 13 1
- Page 904 and 905:
Guide Specification the installatio
- Page 906 and 907:
Guide Specification Maximum Voltage
- Page 908 and 909:
Guide Specification F. Each breaker
- Page 910 and 911:
Guide Specification u. Demand and P
- Page 912 and 913:
Guide Specification B. Voltage and
- Page 914 and 915:
Guide Specification a. Safety: UL 6
- Page 916 and 917:
Guide Specification b. Waveforms sh
- Page 918 and 919:
Guide Specification a. Eight (8) di
- Page 920 and 921:
Guide Specification A. The switchge
- Page 922 and 923:
Guide Specification ANSI standards.
- Page 924 and 925:
Guide Specification SECTION 26 22 0
- Page 926 and 927:
Guide Specification I. Basic Impuls
- Page 928 and 929:
Guide Specification B. Use flexible
- Page 930 and 931:
Guide Specification 10. Cable termi
- Page 932 and 933:
Guide Specification PART 2 - PRODUC
- Page 934 and 935:
2.4 BUS Guide Specification H. An i
- Page 936 and 937:
Guide Specification control circuit
- Page 938 and 939:
Guide Specification for remote sett
- Page 940 and 941:
Guide Specification 2.10 ENCLOSURES
- Page 942 and 943:
Guide Specification B. The training
- Page 944 and 945:
Guide Specification B. Product Data
- Page 946 and 947:
Guide Specification 2.2 MOLDED CASE
- Page 948 and 949:
Guide Specification C. Allow witnes
- Page 950 and 951:
Guide Specification 1.3 SUBMITTALS
- Page 952 and 953:
Guide Specification PART 3 - EXECUT
- Page 954 and 955:
Guide Specification C. Submit dimen
- Page 956 and 957:
Guide Specification B. Product Desc
- Page 958 and 959:
Guide Specification 3.3 INSTALLATIO
- Page 960 and 961:
Guide Specification 1.4 CLOSEOUT SU
- Page 962 and 963:
Guide Specification 3.2 FIELD QUALI
- Page 964 and 965:
Guide Specification 2.1 HINGED COVE
- Page 966 and 967:
Guide Specification SECTION 26 27 2
- Page 968 and 969:
Guide Specification C. Configuratio
- Page 970 and 971:
Guide Specification 3.7 CLEANING A.
- Page 972 and 973:
Guide Specification A. Manufacturer
- Page 974 and 975:
Guide Specification A. Manufacturer
- Page 976 and 977:
Guide Specification SECTION 26 28 2
- Page 978 and 979:
Guide Specification PART 3 - EXECUT
- Page 980 and 981:
Guide Specification A. Project Reco
- Page 982 and 983:
Guide Specification protected by ar
- Page 984 and 985:
Guide Specification E. Sequence of
- Page 986 and 987:
Guide Specification switch is in no
- Page 988 and 989:
Guide Specification 2.3 SOURCE QUAL
- Page 990 and 991:
Guide Specification SECTION 26 29 1
- Page 992 and 993:
Guide Specification 4. Pushbuttons:
- Page 994 and 995:
Guide Specification 1.4 SUBMITTALS
- Page 996 and 997:
Guide Specification B. Product Desc
- Page 998 and 999:
Guide Specification complete contro
- Page 1000 and 1001:
Guide Specification in accordance w
- Page 1002 and 1003:
Guide Specification 2.10 RADIATOR M
- Page 1004 and 1005:
Guide Specification connecting to t
- Page 1006 and 1007:
Guide Specification SECTION 26 33 0
- Page 1008 and 1009:
Guide Specification 3.1 INSTALLATIO
- Page 1010 and 1011:
Guide Specification B. Design Requi
- Page 1012 and 1013:
Guide Specification 1.5 SUBMITTALS
- Page 1014 and 1015:
Guide Specification 1. Wiring pract
- Page 1016 and 1017:
Guide Specification C. Inverter 7.
- Page 1018 and 1019:
Guide Specification (3) DC Under vo
- Page 1020 and 1021:
Guide Specification 5. Controls (2)
- Page 1022 and 1023:
Guide Specification 2. Isolation a.
- Page 1024 and 1025:
Guide Specification a. Eight sets o
- Page 1026 and 1027:
Guide Specification PART 3 - EXECUT
- Page 1028 and 1029:
Guide Specification SECTION 26 43 1
- Page 1030 and 1031:
Guide Specification and the followi
- Page 1032 and 1033:
Guide Specification 3. Neutral to G
- Page 1034 and 1035:
Guide Specification SECTION 26 51 0
- Page 1036 and 1037:
Guide Specification 1.11 WARRANTIES
- Page 1038 and 1039:
Guide Specification 1. Philips. 2.
- Page 1040 and 1041:
Guide Specification SECTION 27 50 0
- Page 1042 and 1043:
Guide Specification G. Submit all f
- Page 1044 and 1045:
Guide Specification 14. ANSI/TIA/EI
- Page 1046 and 1047:
Guide Specification 7. The listing
- Page 1048 and 1049:
Guide Specification H. The Contract
- Page 1050 and 1051:
Guide Specification B. Provide 4-po
- Page 1052 and 1053:
Guide Specification D. Acceptable M
- Page 1054 and 1055:
Guide Specification Baggage Handlin
- Page 1056 and 1057:
Guide Specification 3.2 PHASES OF I
- Page 1058 and 1059:
Guide Specification 3.7 SYSTEM STAR
- Page 1060 and 1061:
H. I. J. K. L. M. Guide Specificati
- Page 1062 and 1063:
Guide Specification 3.13 COMPUTERIZ
- Page 1064 and 1065:
Guide Specification 1.3 MATERIALS O
- Page 1066 and 1067:
Guide Specification E. Storage or s
- Page 1068 and 1069:
Guide Specification F. Existing Ite
- Page 1070 and 1071:
Guide Specification C. Refrigerant:
- Page 1072 and 1073:
Guide Specification SECTION 27 13 3
- Page 1074 and 1075:
Guide Specification F. Post changes
- Page 1076 and 1077:
Guide Specification 1.7 EQUIPMENT C
- Page 1078 and 1079:
Guide Specification Contractor is r
- Page 1080 and 1081:
Guide Specification PART 3 - EXECUT
- Page 1082 and 1083:
Guide Specification O. Spare condui
- Page 1084 and 1085:
Guide Specification 3.6 COMPUTERIZE
- Page 1086 and 1087:
Guide Specification O. NEMA Nationa
- Page 1088 and 1089:
Guide Specification 5. ANSI/TIA/EIA
- Page 1090 and 1091:
Guide Specification D. Major items
- Page 1092 and 1093:
Guide Specification 2. The system s
- Page 1094 and 1095:
Guide Specification 7. Web-Based/Cl
- Page 1096 and 1097:
Guide Specification 2.4 FIRESTOPPIN
- Page 1098 and 1099:
Guide Specification B. Upon concurr
- Page 1100 and 1101:
Guide Specification 7. Termination
- Page 1102 and 1103:
Guide Specification 1) After conclu
- Page 1104 and 1105:
Guide Specification C. All indoor c
- Page 1106 and 1107:
Guide Specification SECTION 27 51 1
- Page 1108 and 1109:
Guide Specification PAGING SYSTEMS
- Page 1110 and 1111:
Guide Specification C. System insta
- Page 1112 and 1113:
Guide Specification H. All audio sw
- Page 1114 and 1115:
Guide Specification 1. The PDRP sys
- Page 1116 and 1117:
Guide Specification S. Monitor/test
- Page 1118 and 1119:
Guide Specification PAGING SYSTEMS
- Page 1120 and 1121:
Guide Specification 1.6 QUALITY ASS
- Page 1122 and 1123:
Guide Specification warranty period
- Page 1124 and 1125:
Guide Specification 5. Intelligibil
- Page 1126 and 1127:
Guide Specification Custom software
- Page 1128 and 1129:
Guide Specification Fire Stop Syste
- Page 1130 and 1131:
Guide Specification 1. On-Site Perf
- Page 1132 and 1133:
Guide Specification D. Endurance Te
- Page 1134 and 1135:
Guide Specification PAGING SYSTEMS
- Page 1136 and 1137:
Guide Specification 5. Absence of g
- Page 1138 and 1139:
Guide Specification 3. Freedom From
- Page 1140 and 1141:
Guide Specification inspection, LAW
- Page 1142 and 1143:
Guide Specification security contra
- Page 1144 and 1145:
Guide Specification 1. Provide shop
- Page 1146 and 1147:
Guide Specification 10. Record draw
- Page 1148 and 1149:
Guide Specification 6. 49 CFR 1520
- Page 1150 and 1151:
Guide Specification 5. Where applic
- Page 1152 and 1153:
Guide Specification Contractor is r
- Page 1154 and 1155:
Guide Specification 2. GE DOR model
- Page 1156 and 1157:
Guide Specification a. Cooper Notif
- Page 1158 and 1159:
Guide Specification 2.6 FIRESTOPPIN
- Page 1160 and 1161:
Guide Specification a. Floors - thr
- Page 1162 and 1163:
Guide Specification 5. All equipmen
- Page 1164 and 1165:
Guide Specification 3.5 INSPECTIONS
- Page 1166 and 1167:
Guide Specification 7. The test pro
- Page 1168 and 1169:
Guide Specification c. Receipt of w
- Page 1170 and 1171:
Guide Specification 2. The Contract
- Page 1172 and 1173:
Guide Specification inspection, LAW
- Page 1174 and 1175:
Guide Specification camera cannot b
- Page 1176 and 1177:
Guide Specification G. Installation
- Page 1178 and 1179:
Guide Specification 1. In addition
- Page 1180 and 1181:
Guide Specification 9. 49 CFR 1544
- Page 1182 and 1183:
Guide Specification B. Manufacturer
- Page 1184 and 1185:
Guide Specification K. Following ea
- Page 1186 and 1187:
Guide Specification c. CIF d. QCIF
- Page 1188 and 1189:
Guide Specification 14. Dome: Dome
- Page 1190 and 1191:
Guide Specification 5. Frame Rate s
- Page 1192 and 1193:
Guide Specification H. Wire and Cab
- Page 1194 and 1195:
Guide Specification E. The Contract
- Page 1196 and 1197:
Guide Specification suggested means
- Page 1198 and 1199:
Guide Specification 3.4 IDENTIFICAT
- Page 1200 and 1201:
Guide Specification C. In addition
- Page 1202 and 1203:
Guide Specification 7. Termination
- Page 1204 and 1205:
Guide Specification VIDEO SURVEILLA
- Page 1206 and 1207:
Guide Specification b. An operation
- Page 1208 and 1209:
Guide Specification 14. State of Ca
- Page 1210 and 1211:
Guide Specification 2. Initiating D
- Page 1212 and 1213:
Guide Specification 3) Occupied Roo
- Page 1214 and 1215:
Guide Specification B. Elevator Lob
- Page 1216 and 1217:
Guide Specification 1. The point-to
- Page 1218 and 1219:
Guide Specification panel, a separa
- Page 1220 and 1221:
Guide Specification 1. The fire ala
- Page 1222 and 1223:
Guide Specification 3. In the event
- Page 1224 and 1225:
Guide Specification 2. Network alph
- Page 1226 and 1227:
Guide Specification program control
- Page 1228 and 1229:
Guide Specification 2. The percent
- Page 1230 and 1231:
Guide Specification 3. The module s
- Page 1232 and 1233:
Guide Specification and to insure t
- Page 1234 and 1235:
Guide Specification 8. It shall be
- Page 1236 and 1237:
Guide Specification 3. All non-addr
- Page 1238 and 1239:
Guide Specification I. End of Line
- Page 1240 and 1241:
Norman Y. Mineta San José Internat
- Page 1242 and 1243:
Norman Y. Mineta San José Internat
- Page 1244 and 1245:
Norman Y. Mineta San José Internat
- Page 1246 and 1247:
Norman Y. Mineta San José Internat
- Page 1248 and 1249:
Norman Y. Mineta San José Internat
- Page 1250 and 1251:
Norman Y. Mineta San José Internat
- Page 1252 and 1253:
Norman Y. Mineta San José Internat
- Page 1254 and 1255:
Norman Y. Mineta San José Internat
- Page 1256 and 1257:
Norman Y. Mineta San José Internat
- Page 1258 and 1259:
Norman Y. Mineta San José Internat
- Page 1260 and 1261:
Norman Y. Mineta San José Internat
- Page 1262 and 1263:
Norman Y. Mineta San José Internat
- Page 1264 and 1265:
Norman Y. Mineta San José Internat
- Page 1266 and 1267:
Norman Y. Mineta San José Internat
- Page 1268 and 1269:
Norman Y. Mineta San José Internat
- Page 1270 and 1271:
Norman Y. Mineta San José Internat
- Page 1272 and 1273:
Norman Y. Mineta San José Internat
- Page 1274 and 1275:
Norman Y. Mineta San José Internat
- Page 1276 and 1277:
Norman Y. Mineta San José Internat
- Page 1278 and 1279:
Norman Y. Mineta San José Internat
- Page 1280 and 1281:
Page 1 of 10 GENERAL CONDITIONS GC-
- Page 1282 and 1283:
specified coverages shall be filed
- Page 1284 and 1285:
GC-19. WAIVER 19.01 The waiver by C
- Page 1286 and 1287:
Page 7 of 10 other unsuitability to
- Page 1288 and 1289:
Page 1 of 10 SPECIAL CONDITIONS SC-
- Page 1290 and 1291:
SC-9. OPERATION OF VEHICLES 9.01 Co
- Page 1292 and 1293:
14.02 Cleaning of Site: The Contrac
- Page 1294 and 1295:
Page 7 of 10 7. Annual clean down o
- Page 1296 and 1297:
SC-19. REPORTS 19.01 Unless specifi
Inappropriate
Loading...
Inappropriate
You have already flagged this document.
Thank you, for helping us keep this platform clean.
The editors will have a look at it as soon as possible.
Mail this publication
Loading...
Embed
Loading...
Delete template?
Are you sure you want to delete your template?
DOWNLOAD ePAPER
This ePaper is currently not available for download.
You can find similar magazines on this topic below under ‘Recommendations’.