Guide Specification<br />

corrective action as being successful, <strong>and</strong> recommended point for<br />

resumption of testing.<br />

2) After submission of report, schedule review meeting at job site. Schedule<br />

date <strong>and</strong> time with the <strong>Design</strong> Consultant.<br />

3) At review meeting, demonstrate that all failures have been corrected by<br />

performing verification tests.<br />

4) Based on report <strong>and</strong> review meeting, the <strong>Design</strong> Consultant will direct<br />

Contractor to repeat Phase I, restart Phase I, or proceed to Phase III - Final<br />

Testing.<br />

c. Phase III - Final Testing:<br />

1) Time: 24 hours per day for 15 consecutive calendar days.<br />

2) Make no repairs during this phase unless authorized in writing by Engineer.<br />

.<br />

7. Phase IV - Final Assessment:<br />

1) After conclusion of Phase III or termination of testing, identify all failures,<br />

determine causes, <strong>and</strong> repair. Submit explaining the nature of each failure,<br />

corrective action taken, results of tests performed, <strong>and</strong> recommended point<br />

for resumption of testing.<br />

2) After submission of report schedule review meeting at job site. Schedule<br />

date <strong>and</strong> time with the <strong>Design</strong> Consultant.<br />

3) At review meeting, demonstrate that all failures have been corrected by<br />

performing verification tests.<br />

4) Based on report <strong>and</strong> review meeting, the <strong>Design</strong> Consultant will approve<br />

endurance test or direct Contractor to repeat all or part of Phases III <strong>and</strong> IV.<br />

8. Adjustment, Correction, <strong>and</strong> Maintenance<br />

a. During endurance testing make adjustments <strong>and</strong> corrections to system only after<br />

obtaining written approval of the <strong>Design</strong> Consultant.<br />

b. During endurance testing, perform required maintenance on systems including<br />

provision of replacement parts.<br />

G. Final Inspection <strong>and</strong> Acceptance<br />

1. After endurance testing is complete, review tabulated records with the <strong>Design</strong> Consultant.<br />

ACCESS CONTROL AND ALARM MONITORING SYSTEM (ACAMS)<br />

REQUIREMENTS<br />

28 13 00 - 29<br />

Security Systems