12.02.2013 Views

Design and Construction Handbook - Los Angeles World Airports

Design and Construction Handbook - Los Angeles World Airports

Design and Construction Handbook - Los Angeles World Airports

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

1. Printed artwork/messaging shall be on a vinyl<br />

material <strong>and</strong> applied precisely <strong>and</strong> professionally to<br />

exact placement specifications of the constructed<br />

barricade. It is important to note that the intention<br />

of the vinyl wrap design is to be reutilized for as<br />

many future barricades as possible for cost<br />

savings. Because of this, it is extremely important<br />

to follow the installation <strong>and</strong> de-installation<br />

guidelines to ensure that the printed vinyl stays in<br />

the best condition possible for reutilization.<br />

2. Four (4) Contractor personnel per barricade are<br />

required for installation. Overview supervision of<br />

the installation shall be by the vendor, GP Color.<br />

Contractor shall not install any wraps without the<br />

presence of the GP Color supervision.<br />

3. Careful h<strong>and</strong>ling of 10-foot long rolls of vinyl to<br />

avoid damage (i.e. tearing, stretching) to the printed<br />

vinyl wraps.<br />

4. Hanging the vinyl to follow proper placement<br />

including: affixing to barricade using staple gun,<br />

inserting wood dowels into pocket on bottom edge,<br />

stretching <strong>and</strong> smoothing out any wrinkles, <strong>and</strong><br />

affixing with more staples.<br />

5. Large vinyl wraps shall be tiled together in order to<br />

form seamless overlaps <strong>and</strong> produce the desired<br />

finished messaging product.<br />

6. Confirmation that placement of windows <strong>and</strong> doors<br />

has been coordinated with artwork schematics so<br />

that no messaging may appear on doors or be cut<br />

off by windows.<br />

7. Barricade installations shall occur during the offpeak<br />

hours, 11p.m. - 6 a.m.<br />

Maintenance of Operations<br />

<strong>Design</strong> <strong>and</strong> <strong>Construction</strong> H<strong>and</strong>book<br />

54 of 84<br />

H<strong>and</strong>book (Version 3) 01.15.11<br />

• Public Safety Convenience: The Contractor<br />

shall conduct all operations with the least<br />

possible obstruction <strong>and</strong> inconvenience to<br />

LAWA, its occupants <strong>and</strong> the public.<br />

• Permit traffic (pedestrian <strong>and</strong> baggage) to<br />

pass through the work area with least<br />

possible inconvenience <strong>and</strong> delay.<br />

• Maintain existing signing <strong>and</strong> lighting<br />

systems in operation as the work proceeds<br />

unless otherwise approved by LAWA.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!