Norman Y. Mineta San José International Airport<br />

Scope of Services Draft<br />

project area components as described in the Program/<strong>Design</strong><br />

Criteria Document. The Contractor shall review, recommend<br />

suggested changes, <strong>and</strong> confirm the basis of design information<br />

provided by the City.<br />

4.1.1.1.2 Definition of Program<br />

4.1.1.1.3 Additional Airport planning studies<br />

4.1.1.1.4 Facility programming<br />

4.1.1.1.5 Cost Planning<br />

4.1.1.2 Data Collection<br />

4.1.1.2.1 The Contractor shall provide l<strong>and</strong> surveys, geotechnical<br />

investigation <strong>and</strong> other data collection to develop the project.<br />

4.1.2. <strong>Design</strong> Services<br />

4.1.2.1 Conceptual/Schematic <strong>Design</strong> Documents (0 to 30% Complete<br />

<strong>Design</strong>)<br />

4.1.2.1.1 Conceptual Facility <strong>Design</strong><br />

4.1.2.1.2 Schematic Facility <strong>Design</strong><br />

4.1.2.1.3 Inner airfield planning <strong>and</strong> design<br />

4.1.2.1.4 Airport l<strong>and</strong>side planning<br />

4.1.2.1.5 Conceptual/Schematic Cost Estimate<br />

4.1.2.2 <strong>Design</strong> Development Documents (31 to 60% Complete <strong>Design</strong>)<br />

4.1.2.2.1 Facility <strong>Design</strong> Development Documents<br />

4.1.2.2.2 Analysis of infrastructure adequacy for Program dem<strong>and</strong>s<br />

4.1.2.2.3 <strong>Design</strong> Development Cost Estimate<br />

4.1.3. <strong>Construction</strong> Documents (61 to 100% Complete <strong>Design</strong>)<br />

4.1.3.1 Facility <strong>Design</strong> Build <strong>Construction</strong> Documents<br />

4.1.3.2 100% Completion <strong>and</strong> Final Cost Estimate<br />

4.1.4. Public <strong>Construction</strong> Bid Packages<br />

4.1.4.1 Facility Biddable <strong>Construction</strong> Documents<br />

4.1.4.2 Participation in Bid period activities<br />

4.1.4.3 Response to Bidders questions<br />

4.1.5. <strong>Construction</strong> Administration<br />

4.1.5.1 Review of submittals<br />

4.1.5.2 Periodic observations<br />

4.1.5.3 Start-up assistance<br />

4.1.5.4 Record drawings<br />

5. PRE-DESIGN SERVICES<br />

The Pre-<strong>Design</strong> Stage initiates the Program <strong>and</strong> begins with the assembly <strong>and</strong> digestion of<br />

data related to existing conditions, use patterns <strong>and</strong> Airport policies. The Pre-<strong>Design</strong> Stage<br />

includes the preparation of studies, diagrams, <strong>and</strong> other documents conveying the general<br />

Program assessment <strong>and</strong> basis of design, for presentation to the City for approval.<br />

Revision G – 15 August 2006 CHAPTER III-01 - <strong>Design</strong> Tasks And Deliverables - 11