Norman Y. Mineta San José International Airport<br />

Scope of Services Draft<br />

7.2.4.9.2 Typical FF&E details<br />

7.2.5. Code Analyses<br />

7.2.5.1 Fire <strong>and</strong> life safety codes<br />

7.2.5.2 Sprinkler <strong>Design</strong> requirements<br />

7.2.5.3 Hazardous materials h<strong>and</strong>ling<br />

7.2.5.4 State of California Title 24 Energy conservation measures<br />

7.2.5.5 Electrical Safety<br />

7.2.5.6 ADA compliance<br />

7.2.5.7 Aviation related regulations<br />

7.2.6. <strong>Design</strong> Calculations<br />

7.2.6.1 As required to support Code Analyses<br />

7.2.7. Cost Estimates<br />

7.2.7.1 <strong>Design</strong> Development Cost Estimate based on the <strong>Design</strong><br />

Development documentation.<br />

7.2.8. Other <strong>Design</strong> Development Documents<br />

7.2.8.1 Written reports for Systems Study<br />

7.2.8.2 Complete list of projected drawings <strong>and</strong> specification sections to be<br />

included in <strong>Construction</strong> Document package.<br />

7.2.8.3 Updated detailed Project Management Plan for the 1) <strong>Construction</strong><br />

Documents, 2) Public <strong>Construction</strong> Bid Packages, <strong>and</strong> 3) <strong>Construction</strong><br />

Administration stages.<br />

7.2.9. Electronic versions of all required deliverables.<br />

7.3. Completion Evaluation<br />

7.3.1. In the aggregate the Program should be 60% complete at the end of the<br />

<strong>Design</strong> Development stage.<br />

7.3.2. The deliverables submitted shall be evaluated for completion as follows:<br />

7.3.2.1 All deliverables requested have been submitted.<br />

7.3.2.2 The documents submitted are clear, easy to comprehend, correct <strong>and</strong><br />

legible.<br />

7.3.2.3 All data required for each drawing, study, specification, etc, have been<br />

submitted.<br />

7.3.2.4 All deliverables submitted respond to all the task items identified in<br />

Section 2.<br />

7.3.3. Each set of documents will be evaluated on a scale to be developed as part<br />

of the Project Management Plan.<br />

8. CONSTRUCTION DOCUMENTS - 61 TO 100% COMPLETE<br />

The <strong>Construction</strong> Document Stage consists of the preparation of detailed drawings <strong>and</strong><br />

specifications to identify the specific materials, quantities, methods <strong>and</strong> systems required to<br />

build the Program. This stage is the single largest component of the DB’s design work.<br />

Revision G – 15 August 2006 CHAPTER III-01 - <strong>Design</strong> Tasks And Deliverables - 28