SIGNAGE<br />

10 14 23 - 18<br />

Guide Specification<br />

E. Prior to installation, confirm all electrical locations <strong>and</strong> requirements with LAWA.<br />

3.3 CLEAN UP<br />

A. Keep areas of work clean, neat <strong>and</strong> orderly at all times. Clean surfaces, inside <strong>and</strong> out. Use<br />

approved cleaners if necessary to remove dirt.<br />

B. Protective coverings <strong>and</strong> strippable films shall be removed at a time that will afford the greatest<br />

protection of the furniture. Surfaces shall be cleaned to remove excess glazing <strong>and</strong> sealant<br />

compounds, dirt, <strong>and</strong> other substances.<br />

C. Upon completion of work <strong>and</strong> before final acceptance, remove tools, surplus materials,<br />

apparatus, <strong>and</strong> debris from the site. Leave the site in a neat, clean condition, acceptable to the<br />

Engineer. Wash, clean, <strong>and</strong> leave paved areas without stains.<br />

3.4 FINAL INSPECTION AND ACCEPTANCE<br />

A. Upon completion of work, a final inspection for acceptance will be performed by LAWA.<br />

B. All mock-ups <strong>and</strong> unused submittals shall be removed from site prior to final acceptance.<br />

C. Submit operation manuals, tools, <strong>and</strong> keys as specified in this Section.<br />

END OF SECTION 10 14 00<br />

Wayfinding <strong>and</strong> Signage