Norman Y. Mineta San José International Airport<br />

Scope of Services Draft<br />

5.1.4.5.1 Determine sizing for all individual facility components including<br />

building services<br />

5.1.4.5.2 Establish relationship considerations between components, noting<br />

flows from component to component <strong>and</strong> develop use/relationship<br />

diagrams<br />

5.1.4.5.3 Note operational <strong>and</strong> spatial characteristics for individual facility<br />

components<br />

5.1.4.5.4 Determine appropriate net-to-gross factors<br />

5.1.4.5.5 Compile overall Space Tabulation<br />

5.1.4.6 Determine logistics considerations<br />

5.1.4.6.1 Preferred <strong>and</strong> existing materials <strong>and</strong> systems<br />

5.1.4.6.2 <strong>Construction</strong> limitations<br />

5.1.4.7 Package the initial Program Criteria Document in an orderly<br />

updateable format<br />

5.1.5. Set Program Cost Target<br />

5.1.5.1 Overall<br />

5.1.5.2 By facility system<br />

5.1.6. Participate in City workshops<br />

Determine what information is required to be collected or conveyed via<br />

workshops with the City. Schedule required workshop through the City’s<br />

<strong>Design</strong> Manager<br />

5.1.6.1 In-progress as required<br />

5.1.6.2 Presentation of findings of the Pre-<strong>Design</strong> Stage<br />

5.1.7. Sustainable <strong>Design</strong><br />

5.1.7.1 Follow the requirements for implementing the U.S. Green Building<br />

Council's (USGBC) "Leadership in Energy <strong>and</strong> Environmental <strong>Design</strong>"<br />

(LEED) Program as described in Chapter II-01 General <strong>Design</strong><br />

Approach.<br />

5.1.7.2 In addition:<br />

5.1.7.2.1 Provide a completed LEED Project Checklist indicating<br />

Prerequisites <strong>and</strong> Credits to be implemented into the facility<br />

design <strong>and</strong> the total anticipated LEED score for the project.<br />

5.1.7.2.2 Description of how each anticipated LEED Prerequisite <strong>and</strong> Credit<br />

shall be achieved.<br />

5.1.7.2.3 Identify the <strong>Design</strong> Team's LEED Accredited Professionals as<br />

recognized by the U.S. Green Building Council.<br />

5.1.7.2.4 List the Architects <strong>and</strong> Engineers from the <strong>Design</strong> Team <strong>and</strong> who<br />

are responsible for implementing each Prerequisite <strong>and</strong> Credit into<br />

the facility design.<br />

5.2. Deliverables<br />

5.2.1. CAD Procedures Manual<br />

5.2.2. Pre-<strong>Design</strong> Presentation materials<br />

Revision G – 15 August 2006 CHAPTER III-01 - <strong>Design</strong> Tasks And Deliverables - 14