Guide Specification<br />

c. Quality Assurance Plan.<br />

K. Maintenance Manuals: Manuals including maintenance instructions <strong>and</strong> other descriptive<br />

material as received from the manufacturers shall be provided that will enable LAWA personnel<br />

to maintain equipment <strong>and</strong> test equipment. This documentation shall include descriptions,<br />

specifications, theory of operation (where applicable), layout drawings (showing component<br />

types <strong>and</strong> positions), <strong>and</strong> back-panel <strong>and</strong> assembly wiring diagrams. In addition to hardcopies,<br />

electronic copies, in a <strong>Design</strong> Consultant approved format, shall be provided.<br />

L. Preventative Maintenance: Instructions shall be provided for preventive maintenance procedures<br />

that include examinations, tests, adjustments, <strong>and</strong> periodic cleaning. The manuals shall provide<br />

guidelines for isolating the causes of hardware malfunctions <strong>and</strong> for localizing faults. The<br />

manuals shall provide thorough instructions on the use of any specialized test equipment needed<br />

for hardware maintenance. In addition to hardcopies, electronic copies, in a <strong>Design</strong> Consultant<br />

approved format, shall be provided.<br />

M. Maintenance Schedule: A recommended schedule for preventative, routine, <strong>and</strong> emergency<br />

maintenance indicating frequency <strong>and</strong> required response time. Preventative maintenance<br />

services during peak activity periods shall be avoided. The Contractor shall coordinate with<br />

LAWA to define peak activity periods. The Contractor shall submit a finalized preventative<br />

maintenance schedule for <strong>Design</strong> Consultant approval.<br />

N. Project Record Documents required include:<br />

1. Marked-up copies of Contract Drawings<br />

2. Marked-up copies of Shop Drawings<br />

3. Newly prepared Drawings<br />

4. Marked-up copies of Specifications, Addenda <strong>and</strong> Change Orders<br />

5. Marked-up Project Data submittals<br />

6. Record Samples<br />

7. Field records for variable <strong>and</strong> concealed conditions<br />

8. Record information on Work that is recorded only schematically<br />

9. As-built drawings<br />

10. Record drawings<br />

11. Electronic as-built <strong>and</strong> LAWA LUSAD requirements<br />

O. As-built drawings:<br />