12.02.2013 Views

Design and Construction Handbook - Los Angeles World Airports

Design and Construction Handbook - Los Angeles World Airports

Design and Construction Handbook - Los Angeles World Airports

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Guide Specification<br />

C. Signal <strong>and</strong> Control Terminals: Modular construction type, suitable for channel mounting,<br />

with tubular pressure screw connectors, rated 300 volts.<br />

D. Furnish ground bus terminal block, with each connector bonded to enclosure.<br />

PART 3 - EXECUTION<br />

3.1 INSTALLATION<br />

A. Install enclosures <strong>and</strong> boxes plumb. Anchor securely to wall <strong>and</strong> structural supports at<br />

each corner.<br />

B. Install cabinet fronts plumb.<br />

3.2 CLEANING<br />

A. Clean electrical parts to remove conductive <strong>and</strong> harmful materials.<br />

B. Remove dirt <strong>and</strong> debris from enclosure.<br />

C. Clean finishes <strong>and</strong> touch up damage.<br />

END OF SECTION 26 27 16<br />

ELECTRICAL CABINETS AND ENCLOSURES<br />

26 27 16 - 3 Electrical Systems

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!