12.02.2013 Views

Design and Construction Handbook - Los Angeles World Airports

Design and Construction Handbook - Los Angeles World Airports

Design and Construction Handbook - Los Angeles World Airports

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Guide Specification<br />

2. Piping roughing-in requirements.<br />

3. Wiring roughing-in requirements, including spaces reserved for electrical<br />

equipment.<br />

4. Access requirements, including working clearances for mechanical controls <strong>and</strong><br />

electrical equipment, <strong>and</strong> tube pull <strong>and</strong> service clearances.<br />

D. Certificates: Provide certificate from manufacturer.<br />

E. Seismic Qualification Certificates: For chillers, accessories, <strong>and</strong> components, from<br />

manufacturer.<br />

1. Basis for Certification: Indicate whether withst<strong>and</strong> certification is based on<br />

actual test of assembled components or on calculation.<br />

2. Dimensioned Outline Drawings of Equipment Unit: Identify center of gravity<br />

<strong>and</strong> locate <strong>and</strong> describe mounting <strong>and</strong> anchorage provisions.<br />

3. Detailed description of equipment anchorage devices on which the certification is<br />

based <strong>and</strong> their installation requirements.<br />

F. Source quality-control reports.<br />

G. Startup service reports.<br />

H. Operation <strong>and</strong> Maintenance Data: For each chiller to include in emergency, operation,<br />

<strong>and</strong> maintenance manuals. Include start-up instructions, maintenance data, parts lists,<br />

controls, accessories, <strong>and</strong> troubleshooting guide.<br />

1.6 CLOSEOUT SUBMITTALS<br />

A. Operation <strong>and</strong> Maintenance Data: Submit start-up instructions, maintenance data, parts<br />

lists, controls, <strong>and</strong> accessories. Include trouble-shooting guide.<br />

PART 2 - PRODUCTS<br />

2.1 MANUFACTURERS<br />

A. Carrier.<br />

B. Trane.<br />

C. York.<br />

2.2 MANUFACTURED UNIT<br />

A. Description: Factory-assembled <strong>and</strong> -tested chiller complete with compressor,<br />

compressor motor, compressor motor controller, lubrication system evaporator,<br />

condenser, controls, interconnecting unit piping <strong>and</strong> wiring, <strong>and</strong> indicated accessories.<br />

1. For chillers with dual compressors, provide each compressor with a dedicated<br />

CENTRIFUGAL WATER CHILLERS<br />

23 64 16 - 4 Mechanical Systems

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!