Guide Specification<br />

sagging.<br />

D. Tool Kit: Chiller manufacturer shall assemble a tool kit specially designed for use in<br />

serving the chiller(s) furnished. Include special tools required to service chiller<br />

components not readily available to LAWA service personnel in performing routine<br />

maintenance. Place tools in a lockable case with hinged cover. Provide a list of each<br />

tool furnished <strong>and</strong> attach the list to underside of case cover.<br />

E. Quick Start B with Uninterruptible Power Supply (UPS)<br />

1. Quick Start shall enable the chiller to restart in 15 seconds the power is restored.<br />

Quick Start minimizes the time to restart <strong>and</strong> loads the chiller as quickly as<br />

possible, to rapidly achieve the leaving chiller water temperature setpoint. The<br />

main objective is to provide minimum down time <strong>and</strong> the fastest restart/loading<br />

as possible. Once the chiller is running <strong>and</strong> close to setpoint, it will return to<br />

st<strong>and</strong>ard chiller YK control<br />

2.7 SOURCE QUALITY CONTROL<br />

A. Perform functional tests of chillers before shipping.<br />

B. Factory performance test chillers, before shipping, according to ARI 550/590.<br />

1. Test the following conditions:<br />

a. <strong>Design</strong> conditions indicated.<br />

b. Reduction in capacity from design to minimum load in steps of 10 with<br />

condenser fluid at design conditions.<br />

2. Prepare test report indicating test procedures, instrumentation, test conditions,<br />

<strong>and</strong> results. Submit copy of results within one week of test date.<br />

C. For chillers using R-134a refrigerant, factory test <strong>and</strong> inspect evaporator <strong>and</strong> condenser<br />

according to ASME Boiler <strong>and</strong> Pressure Vessel Code: Section VIII, Division 1.<br />

D. For chillers located indoors, rate sound power level according to ARI 575.<br />

PART 3 - EXECUTION<br />

3.1 GENERAL<br />

A. The chillers will be delivered to the designated rigger’s yard. Contractor shall coordinate<br />

shipment, receive, inspect <strong>and</strong> accept responsibility for equipment. Any damage or<br />

deficiency shall be resolved by Contractor directly with manufacturer <strong>and</strong>/or hauler, with<br />

no recourse to the LAWA.<br />

B. Delivery <strong>and</strong> rigging of chillers will be staged based on the construction schedule.<br />

Contractor shall protect equipment, transport to the site, rig into place, install, pipe, wire<br />

<strong>and</strong> test equipment in accordance with drawings, specifications <strong>and</strong> manufacturer’s<br />

CENTRIFUGAL WATER CHILLERS<br />

23 64 16 - 17 Mechanical Systems