Guide Specification<br />

PAGING SYSTEMS<br />

27 51 13 - 3<br />

access code, the document is to contain a list of the user types, a description of their level<br />

of access, <strong>and</strong> what the access code is. The user types (for instance: emergency,<br />

administrator, airline employee, etc.) <strong>and</strong> levels of access shall be determined by the<br />

Owner <strong>and</strong> submitted to the Contractor in a timely manner.<br />

3. The documents above are to be submitted to the <strong>Design</strong> Consultant for approval prior to<br />

the System Acceptance testing. The final version of this document shall be created after<br />

one month of regular system use <strong>and</strong> written approval from the Owner that paging station<br />

zone group assignment are satisfactory.<br />

G. Project Record Documents required include:<br />

1. Marked-up copies of Contract Drawings<br />

2. Marked-up copies of Shop Drawings<br />

3. Newly prepared Drawings<br />

4. Marked-up copies of Specifications, Addenda <strong>and</strong> Change Orders<br />

5. Marked-up Project Data submittals<br />

6. Record Samples<br />

7. Field records for variable <strong>and</strong> concealed conditions<br />

8. Record information on Work that is recorded only schematically<br />

9. As-built drawings<br />

10. Record drawings<br />

H. Post changes <strong>and</strong> modifications to the Documents as they occur. Drawings will be updated<br />

electronically <strong>and</strong> submitted to LAWA in accordance with the schedule provided for this by<br />

LAWA. Do not wait until the end of the Project. <strong>Design</strong> Consultant will periodically review<br />

Project Record Documents to assure compliance with this requirement.<br />

I. At every quarter, submit Project Record Documents to <strong>Design</strong> Consultant for LAWA's records.<br />

1. Upon completion of the as built drawings, the <strong>Design</strong> Consultant will review the as built<br />

work with the Contractor.<br />

2. If the as built work is not complete, the Contractor will be so advised <strong>and</strong> shall complete<br />

the work as required.<br />

J. Project Record Drawings shall also be submitted in electronic format. Electronic drawing<br />

format shall be AutoCAD® Release 2008 or later. LAWA shall have the right <strong>and</strong> capability to<br />

manipulate all electronic file drawings <strong>and</strong> documentation.<br />