Landsat. NASA will have <strong>the</strong> lead responsibility for arranging for foreign ground<br />

station operations.<br />

• Commercialization. NASA will have <strong>the</strong> lead responsibility, with support from<br />

DoD and o<strong>the</strong>r agencies, for promoting and periodically assessing U.S. commercial<br />

opportunities, to <strong>the</strong> extent feasible in <strong>the</strong> Landsat program.<br />

• Advanced Technologies for Landsat 8 and Beyond. NASA, DoD and o<strong>the</strong>r USG<br />

agencies are pursuing advanced technologies that hold significant promise for<br />

future land remote sensing systems. Conducting an advanced technology demonstration<br />

and evaluation effort, with <strong>the</strong> goal of allowing for technology insertion at<br />

an appropriate point in <strong>the</strong> program, is desirable. Accordingly, with <strong>the</strong> support of<br />

NASA, <strong>the</strong> DoE and o<strong>the</strong>r Federal agencies, DoD will have <strong>the</strong> lead responsibility<br />

for preparing a coordinated technology plan that has as a goal improved performance<br />

and reduced cost for future Landsat-type systems. The plan will identify relevant<br />

agency activities and funding that can contribute to this goal.<br />

[6] Approved:<br />

[hand-signed: “Aaron Cohen for”] [hand-signed: “Donald J. Atwood”]<br />

Richard H. Truly Donald J. Atwood<br />

Administrator Deputy Secretary of Defense<br />

National Aeronautics and<br />

Space Administration<br />

3/10/92 3/20/92<br />

Date Approved Date Approved<br />

[7] Attachment 1<br />

Cost Baseline (Then Year $M) 1<br />

DoD Costs:<br />

FY 92 93 94 95 96 97 98 99 00 01 02 Total<br />

30 80 158 134 52 6 2 2 2 2 2 470<br />

Includes:<br />

EXPLORING THE UNKNOWN 351<br />

• Development of One Landsat 6-Equivalent Performance Satellite<br />

– Enhanced Thematic Mapper-class Sensor Performance as a Minimum<br />

– Baseline includes TDRSS Communications<br />

• Launch<br />

– Planned for FY 1997<br />

– Titan II-class launch vehicle from West Cost (Vandenberg AFB)<br />

• Program Support/General Systems-Level Engineering and Integration (SE &I)<br />

NASA Costs:<br />

FY 92 93 94 95 96 97 98 99 00 01 02 Total<br />

7 25 59 61 48 30 32 34 36 38 40 410<br />