i. Pollution n Control Regulations of Department of Environment, Government of India<br />

j. State Pollution Control Board.<br />

k. Rules for Electrical installation by Tariff Advisory Committee (TAC).<br />

l. Guideline for wagon tippler – G33 Rev.01 of May 2010.<br />

m. Any other statutory codes / standards / regulations, as may be applicable.<br />

4.2 Unless covered otherwise by Indian codes & standards and in case nothing to the contrary is<br />

specifically mentioned elsewhere in the specifications, the latest editions (as applicable as<br />

on date of bid opening), pening), of the codes and standards given below shall also apply:<br />

(a.) Japanese Industrial Standards (JIS)<br />

(b.) American National Standards Institute (ANSI)<br />

(c.) American Society of Testing and Materials (ASTM)<br />

(d.) American Society of Mechanical Engineers (ASME)<br />

(e.) American Petroleum Institute (API)<br />

(f.) Standards of the Hydraulic Institute, U.S.A.<br />

(g.) International Organisation for Standardization (ISO)<br />

(h.) Tubular Exchanger Manufacturer's Association (TEMA)<br />

(i.) American Welding Society (AWS)<br />

(j.) National Electrical Manufacturers Association (NEMA)<br />

(k.) National Fire Protection Association (NFPA)<br />

(l.) International Electro Electro-Technical Commission (IEC)<br />

(m.) Expansion Joint Manufacturers Association (EJMA)<br />

(n.) Heat Exchange Institute (HEI)<br />

4.3 In the e event of any conflict between the codes and standards referred to in the above<br />

clauses and the requirement of this specification, the requirement of Technical Specification<br />

shall govern.<br />

4.4 In case of any change in codes, standards & regulations betwee between n the date of bid opening and<br />

the date when vendors proceed with fabrication, the Employer shall have the option to<br />

incorporate the changed requirements or to retain the original standard. It shall be the<br />

responsibility of the Contractor to bring to the no notice tice of the Employer such changes and<br />

advise Employer of the resulting effect.<br />

4.5 EQUIPMENT FUNCTIONAL GUARANTEE<br />

The functional guarantees of the equipment and the system under the scope of the Contract<br />

is given elsewhere in the technical specification. These guarantees shall supplement the<br />

general provisions covered under General Conditions of Contract.<br />

4.6 DESIGN OF FACILITIES/ MAINTENANCE & AVAILABILITY CONSIDERATIONS<br />

4.6.1 Design of Facilities<br />

All the e design procedures, systems and components proposed shall have already been<br />

adequately developed and shall have demonstrated good reliability under similar conditions<br />

elsewhere. The Contractor shall be responsible for the selection and design of appropria appropriate<br />

Technical Specifications: Sec-5,General Techn chnical Requirements<br />

Page 2 of 27