.<br />

Before completion of erection, the Contractor shall remove or dispose of in a satisfactory manner<br />

all temporary structures, packing cases, waste and debris and leave the premises in a condition<br />

satisfactory to the Engineer.<br />

Similarly the labor colony, the offices and the residential areas of the Contractor’s employees and<br />

workmen shall be kept clean & neat to the entire satisfaction of the Engineer. Proper sanitary<br />

arrangements shall be provided by the Contractor, in the work areas office and residential areas of<br />

the Contractors.<br />

44.12 Co-ordination with the Purchaser’s Engineers<br />

The Contractor shall at all times work in co-ordination with the Purchaser’s Engineers and afford<br />

them every facility to become familiar with the erection and maintenance of the equipment.<br />

In respect of observance of local rules, administrative matters, co-ordination with other Contractors<br />

and the like, the Contractor and his personnel shall work under the Purchaser’s Engineer in charge<br />

of the work.<br />

44.13 Work and Services to be provided by the Purchaser<br />

Unless otherwise agreed upon, the following works and services shall be provided by the<br />

Purchaser for carrying out complete erection work:<br />

(a) Water Supply<br />

Water supply for construction purpose will be provided by the Purchaser at one mutually<br />

agreed point at site. Drinking water will also be made available at one central point at site.<br />

The Contractor shall make his own arrangement for any further distribution. Such<br />

distribution pipe network shall have the prior approval of the Engineer at site so as not to<br />

interfere with the layout and progress of other construction works. The water supply shall<br />

be free of cost. Contractor shall ensure that there is no wastage of water. On completion of<br />

the work, the Contractor shall remove all such work and shall reinstate and make good any<br />

work disturbed to the satisfaction of the Engineer.<br />

(b) Power Supply<br />

(I) Electric power will be supplied at 400/440 V and shall be metered and charged at<br />

applicable rates.<br />

(II) Supply for execution of work will be made available at one point only. This point<br />

will not be more than 500 meters away from the Contractor’s premises. The<br />

Contractor shall make his own arrangement at his own cost for distribution of<br />

Tender Documents Commercial (Indigenous) Page 40 of 56