25.04.2013 Views

NATIONAL ALUMINIUM COMPANY LIMITED - Rites

NATIONAL ALUMINIUM COMPANY LIMITED - Rites

NATIONAL ALUMINIUM COMPANY LIMITED - Rites

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Nos (Total 4 Nos in the Crane ffor<br />

or Long Travel motion) The Wheel shall be of forged steel<br />

having composition as Cr 55 Mn 75 (EN 9) hardened to 300 300-350 350 BHN with minimum depth<br />

10mm confirming SAE 1055 / IS 1570 & shall be fitted with roller bearings with dust proof<br />

seals. For lubrication, Grease nipples shall be provided at convenient points.<br />

Twin drive system to be adopted for Long Travel of E. O. T. in the bay.<br />

One wheel in each carriage is to be driven by forged steel gears through a motor mounted<br />

on or adjacent to the carriage.<br />

Long travel mechanism shall be provided with, a thruster brake on each individual drive of<br />

the track wheels. These brakes shall be such that it can be operated from both the control<br />

desk as well as remote control. The brakes shall be of post type with hing hinged shoes, lined<br />

with good quality reinforced bonded brake lining and suitable for easy of adjustment of the<br />

wear on lining.<br />

An independent additional mech. / electrical operating brake are to be provided with LT<br />

motion to stop the crane immediately in ca case of power failure.<br />

13.3 DATA SHEET<br />

13.3.0 CAPACITY AND LEADING DIMENSION<br />

13.3.1 Safe Working Load: Main Hoist - 25T<br />

13.3.2 Safe Working Load: Aux. Hoist - 5T<br />

13.3.3 Duty as per I.S.3177 (Latest Amendment)<br />

13.3.4 SPEED OF MECHANISMS:<br />

(a) Main hoist Hoisting / Lowering - 6 M/Min<br />

(b) Aux. Hoist Hoisting / Lowering - 8 M/Min<br />

(c) Cross Traverse (CT) Forward/ reverse - 10 M/Min<br />

(d) Long Travel (LT) Left / Right - 30 M/Min<br />

13.3.5 (a) Normal Span: Actual span & other dimensions as required as per structural steel<br />

shed of wagon tippler shall be evaluated by the bidder and confirmed in the bid.<br />

13.3.6 (b) RailCenter to Center: Bidder to confirm<br />

13.3.7 Gantry Rail heights above floor level: Bidder to confirm<br />

13.3.8 Hook lift above flo floor or level to be provided: Bidder to confirm depending upon actual<br />

site condition<br />

13.3.9 Type of Hook - Shank type<br />

13.3.10 Available head height above rail top: to be confirmed by Bidder<br />

13.3.11 Available side clearance from gantry rail center: Bidder to confirm<br />

13.3.12 Location<br />

Wagon tippler shed, Bay Length & Width: Bidder to confirm<br />

13.3.13 Electric power supply - 415 Volt, 3 Phase, 50 HZ A.C. Supply<br />

13.3.14 Gantry rail size - Bidder to confirm.<br />

Technical Specification:Sec-4,System System Parameters, Operation & Control Philosophy<br />

Page 24 of 64

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!