14.0 MONORAILS AND HOISTS<br />

14.1 GENERAL<br />

Suitable handling arrangements shall be provided for all equipment’s included in<br />

Contractor’s scope to transfer the equipment to maintenance area within the building<br />

and/or to transfer the equipment outside the building upto ground level for further<br />

transportation by the Owner. For this purpose Contractor shall provide monorails and hoist<br />

blocks with cross travel facility.<br />

14.1.1 CODES AND STANDARDS<br />

The design, manufacture, inspection and testing of Monorails and Hoists shall comply with<br />

all the currently applicable statutes, regulations and safety codes in the locality where the<br />

equipment is to be installed. The Monorails & Hoists shall conform to the latest edition of<br />

the following standards & codes. Other internationally acceptable standards/codes, which<br />

ensure equal al or higher performance than those specified, shall also be accepted. Nothing in<br />

this specification shall be construed to relieve the contractor of the required statutory<br />

responsibility. In case of any conflict in the standard and this specification, the decision of<br />

the Owner/RITES shall be final and binding.<br />

14.2 DESIGN REQUIREMENTS<br />

• IS:3938 : Specification for Electric Wire Rope Hoist<br />

• IS:3832 : Chain pulley blocks<br />

• IS:2429 : Round steel short link chain<br />

• IS:6216 :Short link chain grade 80<br />

• IS:8610 :Points hooks with shank for gener general al engineering purposes<br />

• IS:210 : Cast Iron Castings<br />

14.2.1 For the Hoists with more than 2.0 tonne lifting capacity or more than 10.0 M lift, with the<br />

exception of hoists for GTU and bend pulleys motor operated hoist blocks for both long<br />

travel and lift shall be provided. Other hoist blocks shall be of hand operated type for both<br />

travel and lift. For hoists for GTU’s and bend pulleys clause no. 1.02.18 shall be referred to.<br />

All monorails coming out of the buildings shall be provi provided ded with electric hoist blocks,<br />

irrespective of load and lift. Minimum 3 meter length of Cantilever shall be provided in<br />

monorails coming out of the building to lower the equipment to ground level clearing the<br />

building sidewalls and any other facilities be beneath neath the floor upto ground level.<br />

14.2.2 The exact lift/travel and the number of the hoisting mechanisms and the mode of lifting<br />

equipment’s to various floors of the buildings shall be as decided by the Owner Owner/RITES at the<br />

time of detailed engineering. Us Use e of single hoist shall be avoided for handling more than one<br />

equipment. Clear height shall be maintained when handling one equipment over other, in<br />

such case dismantling of any equipment shall not be permitted. The center line of monorail<br />

shall not deviate e by more than 500 mm from the center of gravity of any equipment that is<br />

to be lifted. Contractor shall take clear note of the fact that the number and monorail<br />

hoisting systems shall also be decided considering the movement of the equipment being<br />

Technical Specification:Sec-4,System System Parameters, Operation & Control Philosophy<br />

Page 25 of 64