(k.) All manufacturing, fabrication and execution of work in connection with the equipment<br />

/ system, prior to the approval of the drawings, shall be at the Contractor’s risk. The<br />

Contractor is expected not to make any changes in the design of the equipment<br />

/system, system, once they are approved by the Employer. However, if some changes are<br />

necessitated in the design of the equipment/ system at a later date, the Contractor may<br />

do so, but such changes shall promptly be brought to the notice of the Employer<br />

indicating the reasons for the change and get the revised drawing approved again in<br />

strict conformance to the provisions of the Technical Specification.<br />

(l.) Drawings shall include all installations and detailed piping and wiring drawings.<br />

(m.) Assessing & anticipating the rrequirement<br />

equirement and supply of all piping and equipment shall<br />

be done by the contractor well in advance so as not to hinder the progress of piping &<br />

equipment erection, subsequent system charging and its effective draining & venting<br />

arrangement as per site suita suitability.<br />

(n.) Any software used by the contractor shall be given to the project manager and<br />

concerned engineer of employer. The contractor shall make the engineer of the<br />

employer aware of the programme. Any computer aided programme shall be approved<br />

subject to giving entire detail to the project manager.<br />

(o.) Drawings must be checked by the Contractor in terms of its completeness, data<br />

adequacy and relevance with respect to Engineering schedule prior to submission to<br />

the Employer. In case drawings are found to be su submitted bmitted without proper endorsement<br />

for checking by the Contractor, the same shall not be reviewed and returned to the<br />

Contractor for re-submission. submission. The contractor shall make a visit to site to see the existing<br />

facilities and understand the layout completel completely y and collect all necessary data /<br />

drawings at site which are needed as an input to the engineering. The contractor shall<br />

do the complete engineering including interfacing and integration of all his equipment,<br />

systems & facilities within his scope of work as well as interface engineering &<br />

integration of systems, facilities, equipment & works under Employer’s scope and<br />

submit all necessary drawings/ documents for the same.<br />

(p.) All drawings shall be reviewed and approved by Engineering coordinator, including the<br />

following drawings / data which require specific approval.<br />

1. Data sheets for various equipments / systems.<br />

2. Field testing procedures for various equipment and piping system.<br />

3. Pre commissioning / commissioning procedures including flushing, Chemical<br />

cleaning, g, steam blowing and hydro test etc. (Wherever applicable) O&M manual<br />

shall also be reviewed and approved by Employer. The content of O&M manual<br />

shall be as specified elsewhere in the specification.<br />

4. Guarantee test procedures.<br />

5. Any other drawings that may be required by the Engineer from time to time.)<br />

6. Data furnished in the bid shall be binding on the contractor even if superior to<br />

the technical specification requirement and any revision shall be done with the<br />

owner/RITES /RITES’s agreement.<br />

Technical Specifications: Sec-5,General Techn chnical Requirements<br />