as a proof of the final acceptance of the equipment. Such certificate shall not unreasonably<br />

be with held ld nor will the Employer delay the issuance thereof, on account of minor<br />

omissions or defects which do not affect the commercial operation and/or cause any serious<br />

risk to the equipment. Such certificate shall not relieve the Contractor of any of his<br />

obligations ations which otherwise survive, by the terms and conditions of the Contract after<br />

issuance of such certificate.<br />

4.20 TRAINING OF EMPLOYER'S PERSONNEL<br />

The scope of service under training of Employer’s engineers (min. 3 nos.) shall include a<br />

training module in the areas of Operation & Maintenance. Such training should cover the<br />

following areas as a minimum in order to enable these personnel to individually take the<br />

responsibility of operating and maintaining the wagon tippler system in a manner accepta acceptable<br />

to the Employer:<br />

The scope of services under training shall also necessarily include training of Employer's<br />

personnel. This shall cover all disciplines viz, Mechanical, Electrical, C&I, & operation etc. and<br />

shall include all the related areas like Des Design ign familiarization, training on product design<br />

features and product design softwares of major equipment and systems, engineering,<br />

manufacturing, erection, commissioning, training on operating features of equipment,<br />

quality assurance and testing, plant vis visits its and visits to manufacturer's works, exposure to<br />

various kinds of problems which may be encountered in fabrication, manufacturing,<br />

erection, welding etc. The training module prepared by the contractor, shall be submitted<br />

for the Employer’s approval, pri prior to imparting training.<br />

Contractor shall furnish in his offer, details of training module(s) covering above<br />

requirements which shall be subject to Employer's approval. Consolidated training period<br />

included above (for O&M and Engineering) is indicative only. Employer reserves the right to<br />

reappropriate the training period between O&M and engineering depending upon the<br />

details of training module proposed by the Contractor.<br />

Training schedule shall be finalised based on the Contractor's proposal within two (2)<br />

months prior to commissioning.<br />

In all the above cases, wherever the training of Employer's personnel is arranged at the<br />

works of the manufacturer's it shall be noted that the lodging and boarding of the<br />

Employer's personnel shall be at the cost of Co Contractor.<br />

4.21 SAFETY ASPECTS DURING CONSTRUCTION AND ERECTION<br />

In addition to the requirements given in Erection Conditions of Contract (ECC) the following<br />

shall also cover:<br />

1. Working platforms should be fenced and shall have means of access.<br />

2. Ladders in accordance ccordance with Employer’s safety rules for construction and erection shall<br />

be used. Rungs shall not be welded on columns. All the stairs shall be provided with<br />

handrails immediately after its erection.<br />

4.22 NOISE LEVEL<br />

Technical Specifications: Sec-5,General Techn chnical Requirements<br />

Page 23 of 27