1.0 GENERAL<br />

M/S. National Aluminium Company Ltd. (NALCO), Angul have undergone 2<br />

expansion of their Captive Power Plant (CPP).The 9th & 10th units are added in 2nd phase<br />

expansion of the Existing Captive Power Plant (CPP) by increasing the station capacity to<br />

1200MW. Facility for Storage and Handling of about 90,000 t additional<br />

been envisaged to be added in 2nd phase expansion of Captive Power Plant. The new<br />

uncrushed coal storage yard shall be equipped with stacker and reclaimer machines and<br />

shall have uncrushed coal supply connectivity to old and new coal bu<br />

nd phase<br />

expansion of their Captive Power Plant (CPP).The 9th & 10th units are added in 2nd phase<br />

expansion of the Existing Captive Power Plant (CPP) by increasing the station capacity to<br />

1200MW. Facility for Storage and Handling of about 90,000 t additional uncrushed Coal has<br />

been envisaged to be added in 2nd phase expansion of Captive Power Plant. The new<br />

uncrushed coal storage yard shall be equipped with stacker and reclaimer machines and<br />

shall have uncrushed coal supply connectivity to old and new coal bunkers through<br />

respective Crusherhouse. house.<br />

2.0 Basic Data<br />

Material to be handled - Uncrushed coal (Grade E / F / G)<br />

Feed size<br />

- (-) 300 mm<br />

Specific gravity of coal - 0.8 t/m3 for volume calculation<br />

1.1 t/m3 for strength calculation<br />

Moisture (%)<br />

- 6% to 10%<br />

No of working days / yr - 330<br />

No of working shift / day - 3 shift of 8 hrs per day<br />

3.0 DESCRIPTION OF EXISTING SYSTEM<br />

The salient features of existing coal handling facilities consist of following:<br />

3.1 ROM Coal of (-) 300mm mm size is brought from coalfields in Bottom Discharge Captive Railway<br />

Wagons.<br />

3.2 Coal from coalfield is received through a Merry Go Go-round round (MGR) system between the CHP<br />

and coalfield.<br />

3.3 There are two (2) nos. of existing Track Hopper Buildings with undergrou underground RCC hopper.<br />

3.4 Each TrackHopperBuilding has four (4) nos. of paddle feeders of travelling type at its bottom<br />

to scoop coal from the track hopper. Two paddle feeders are mounted on individual<br />

conveyor.<br />

3.5 There are two (2) underground conveyors at bottom of each track hopper. Both conveyors<br />

are running parallel at the bottom of the track hopper hopper–1. 1. The parallel conveyor installed at<br />

the bottom of track hopper hopper–2 run in opposite direction.<br />

3.6 There are two (2) Bunker Bays. The old BunkerBay meets the crushed coal requirement for<br />

Unit 1 – 6 whereas the new BunkerBay meets the crushed coal requirement for unit 7 to 10.<br />

Thus, there are two separate conveyor paths. Each path has two conveyor streams running<br />

in parallel.<br />

Technical Specification:Sec-1 General<br />

SECTION 1<br />

Page 1 of 5