fogging type with a minimum pressure of 2.5 kg/sq.cm(g) at spray nozzle inlet. It should be<br />

possible to operate any number of zones simultaneously. The operation of wagon tippler<br />

dust suppression system shall be automatic so that the foggi fogging ng water spray shall get<br />

activated only when the tippling is in operation.<br />

16.5.4 Each spray head shall have a provision for installing a pressure gauge whenever required.<br />

Further, pressure gauges shall be provided at least at two locations.<br />

16.5.5 Sump Pumps<br />

Sump pumps shall be vertical centrifugal type with separate discharge pipe and shall be<br />

capable of developing required head at rated capacity for continuous operation. Sump<br />

pumps shall be suitable for handling coal slurry & sludge. Head capacit capacity y curve of the pump<br />

shall be rising type up to the shut off condition. Sump pumps alongwith level switches &<br />

piping upto nearest Owner's drain (max upto 50.0 mtrs. from outside the building) shall be<br />

provided at all locations wherever natural drainage is nnot<br />

ot possible. Further sump pumps<br />

alongwith drain pits shall be provided at other locations also, if required, during detailed<br />

engineering stage. The capacity of each pump shall not be less than 50 cub. M/hr.<br />

Continuous motor rating (name plate rating) at 50 deg. C. for sump pump shall have at least<br />

10% margin above the maximum load demand of the equipment in the entire operating<br />

range (including run out condition of pumps in case of parallel operation). The maximum<br />

load demand shall include the drive losses in the transmission system. Size of the sump pit<br />

shall not be less than 2.0 meters x 2.0 meters x 2.5 meters. One no. of settling pit, of<br />

adequate size, before the sump pit shall also be provided so that water without heavy coal<br />

particles goes into sump pu pump mp pit. High and low level switches shall be provided in the sump<br />

pump pit.<br />

16.5.6 Service Water (SW) System<br />

Service water connections are to be provided in conveyor galleries and tunnels at 50 meter<br />

intervals. Adequate number of these connections shall be provided in all transfer houses<br />

with minimum one no. at each floor. Each connection shall be provided with one (1) no. 32<br />

NB globe valve and quick coupling. One (1) No. Hose pipe with nozzle shall be provided in<br />

each building. Service water distributio distribution n system shall be designed considering the water<br />

scheme and water requirement indicated in tender drawings.<br />

16.6 CONSTRUCTION REQUIREMENT<br />

16.6.1 Water Supply Pumps<br />

16.6.1.1 Water supply pumps shall be provided as required.<br />

16.6.1.2 The pumps shall be complete with drive motors, baseplate and other accessories. The<br />

constructional features of the pump shall be as follows:<br />

Technical Specification:Sec-4,System System Parameters, Operation & Control Philosophy<br />

Page 37 of 64

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!