(q.) The Contractor shall submit adequate prints of drawing / data / document for<br />

Employer’s review and approval. The Employer shall review the drawings and return<br />

one (1) copy to the Contractor authorizing either to proceed with manufacture or<br />

fabrication, or marked to show change changes s desired. When changes are required, drawings<br />

shall be re-submitted submitted promptly, with revisions clearly marked, for final review. Any<br />

delays arising out of the failure of the Contractor to submit/rectify and resubmit in time<br />

shall not be accepted as a reason for delay in the contract schedule<br />

(r.) Upon review of each drawing, depending on the correctness and completeness of the<br />

drawing, the same will be categorised and approval accorded in one of the following<br />

categories :<br />

• CATEGORY I Approved<br />

• CATEGORY II Approved subject to incorporation of comments/ modification as<br />

noted. Resubmit revised drawing incorporating the Comments<br />

• CATEGORY III Not approved. Resubmit revised drawings for approval after<br />

incorporating comments/modification as noted.<br />

• CATEGORY IV For informat information and records.<br />

(s.) Vendor shall resubmit the drawings approved under Category II and III within three (3)<br />

weeks of receipt of comments on the drawings, incorporating all comments. Every<br />

revision of the drawing shall bear a revision index wherein such revisio revisions shall be<br />

highlighted in the form of description or marked up in the drawing identifying the same<br />

with relevant revision Number enclosed in a triangle (eg. 1, 2, 3 etc).<br />

• In case Vendor does not agree with any specific comment, he shall furnish the<br />

explanation for the same to owner / consultant for consideration. In all such cases<br />

vendor shall necessarily enclose explanations along with the revised drawing (taking<br />

care of balance comments) to avoid any delay and/or duplication in review work.<br />

• It is responsibility of the Vendor to get all the drawings approved in the Category I<br />

& IV (as the case may be) and complete engineering activities within the agreed<br />

schedule. Any delay arising out of submission and modification of drawings shall<br />

not alter the contract ontract completion schedule. Vendor shall not make any changes in<br />

the portions of the drawing other than those commented upon. If changes are<br />

required to be made in the portions already approved, the vendor shall resubmit<br />

the drawing identifying the change changes for owner/RITES’s ’s review and approval.<br />

(t.) If Vendor fails to resubmit the drawings as per the schedule, construction work at site<br />

will not be held up and work will be carried out on the basis of comments furnished on<br />

previous issues of the drawing. These ccomments<br />

omments will be taken care by the contractor<br />

while submitting the revised drawing.<br />

(u.) All engineering data submitted by the Contractor after final process including review<br />

and approval by the Project Manager/ Employer shall form part of the contract<br />

documents s and the entire works covered under these specification shall be performed<br />

in strict conformity with technical specifications unless otherwise expressly requested<br />

by the Project Manager in writing.<br />

Technical Specifications: Sec-5,General Techn chnical Requirements<br />