(i) Base plates together with foundation bolts and nuts. The base plate shall<br />

accommodate the discharge pipe, which is to be terminated above the floor level.<br />

(ii) Motor stool.<br />

(iii) Non-return return valves and gate vvalves<br />

alves on pump discharge lines (unless otherwise<br />

specifically excluded).<br />

(iv) Lifting lugs, eye bolts etc.<br />

(v) Pre-lubricating lubricating tank with accessories (if necessary).<br />

(vi) Sleeves and inserts to be embedded in concrete.<br />

(vii) Coupling guard, if necessary<br />

16.6.2.13 The pump shaft shall be connected to motor shaft by a heavy duty rigid/flexible coupling<br />

or the pump shall be VV-belt<br />

driven.<br />

16.6.3 PIPING, FITTINGS, VALVES AND SPECIALTIES<br />

16.6.3.1 Piping & Fittings<br />

(a) Material of construction of piping and fittings shall not be inferior to those given in data<br />

sheet of this section.<br />

(b) All piping shall be capable of withstanding the maximum pressure in the corresponding<br />

line at the relevant temperature.<br />

(c) In general pipe sizes 65 mm NB and larger are to be joined by butt welding and pipe work<br />

of size 50 mm NB and below by socket welding/screwed connections. Joints at valves or<br />

specialities shall be flanged for sizes 65 mm NB or large and screwed for sizes 50 mm NB<br />

and below. All galvanized piping shall be joined by screwed connec connections. tions. Minimum pipe<br />

diameter selected for DS/SW/PW/Cooling Water System (along with branch pipes) shall<br />

be 32 NB.<br />

(d) End preparation for butt welding shall be done by machine/flame cutting. Socket weld<br />

and preparation shall be saw/machine cut.<br />

(e) Hangers and supports ports shall be capable of carrying the sum of all concurrently acting<br />

loads. They shall be designed to provide the required supporting effects and allow pipe<br />

line movements as necessary. All guides, anchors, braces, dampers, expansion joints and<br />

structural steel to be attached to the building/structure, trenches etc. shall be provided.<br />

The type of hangers and components for all piping shall be selected and approval<br />

obtained from the Owner Owner/RITES.<br />

(f) All piping shall be routed on ground on concrete pedestals and at road crossings, these<br />

shall be laid through hume pipes.<br />

16.6.3.2 Valves and Specialties<br />

(a) Valves & Specialties shall be used to start, stop or regulate the flow. All valves/specialities<br />

below 50 mm size (for isolation purpose) in service water/dust suppression/potable water<br />

lines should be plug type of proven make.<br />

(b) All valves shall be suitable for most stringent service conditions i.e. flow, temperature and<br />

pressure under which they may be required to operate.<br />

Technical Specification:Sec-4,System System Parameters, Operation & Control Philosophy<br />

Page 40 of 64

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!