(v.) After final acceptance of individual equipment / system bby<br />

y the Employer, the<br />

Contractor will update all original drawings and documents for the equipment / system<br />

to “as built” conditions.<br />

4.8.5 ENGINEERING INFORMATION SUBMISSION SCHEDULE<br />

Prior to the award of Contract, a Detailed Engineering Information Submi Submission Schedule shall<br />

be tied up with the Employer. For this, the Contractor shall furnish a detailed list of<br />

engineering information along with the proposed submission schedule. This list would be a<br />

comprehensive one including all engineering data / drawin drawings gs / information for all bought out<br />

items and manufactured items. The information shall be categorised into the following<br />

parts.<br />

Information that shall be submitted for the approval of the Employer before proceeding<br />

further, and Information that would be submitted for Employer’s information only. The<br />

Engineering Information Schedule shall be updated month wise. The schedule should allow<br />

adequate time for proper review and incorporation of changes/ modifications, if any, to<br />

meet the contract without affect affecting ing the equipment delivery schedule and overall project<br />

schedule. The early submission of drawings and data is as important as the manufacture and<br />

delivery of equipment and hardware and this shall be duly considered while determining the<br />

overall performance e and progress.<br />

4.9 ENGINEERING COORDINATION PROCEDURE<br />

Identification of Principal Engineering Coordinators<br />

4.9.1 The following principal coordinators will be identified by respective organisations at time of<br />

award of contract<br />

RITES’ COORDINATORS<br />

RITES- Engineering Coordinators<br />

Name :<br />

Designation :<br />

Address :<br />

a) Postal :<br />

b) Telegraphic :<br />

TELEX :<br />

FAX : TELEPHONE :<br />

EMPLOYER’S COORDINATORS<br />

NALCO- Engineering Coordinators (NALCO EC)<br />

Name :<br />

Designation :<br />

Address :<br />

a) Postal :<br />

b) Telegraphic :<br />

TELEX :<br />

Technical Specifications: Sec-5,General Techn chnical Requirements<br />

Page 8 of 27