elow wagon tippler hopper including the structural steel shed with E.O.T crane over the<br />

WT-1 1 and other equipment/systems such as Dust Suppression system, ventilation system,<br />

drainage system etc. as specified elsewhere in the specifica specification. tion. However, the track work is<br />

excluded from Contractor’s scope however rails over tippler table and the track for Side Arm<br />

Charger are included in Contractor’s scope.<br />

3.1.4 One (1) no. Rotaside Wagon Tippler Tippler/Rotary Wagon Tippler complete with clamping<br />

arrangements, all structural members, tippler platform, tippling mechanism, tippler drive<br />

along with necessary controls, associated electricals, civil / structural works and accessories.<br />

3.1.5 Side arm charger associated with the Wagon Tippler complete with travel rails, drive<br />

equipment along with necessary controls, associated electricals, civil/structural works &<br />

accessories.<br />

3.1.6 One (1) no. Apron feeder complete with drives, all mechanical, electrical accessories &<br />

supporting g structure etc.<br />

3.1.7 Receiving Belt Conveyors RC RC-1 1 complete with conveyor supporting structures, short<br />

supports, stringers, deck plate, seal plate, conveyor foundations, drive motors, drive units,<br />

pulleys, idlers, gravity take ups, take up structure upt upto o ground level, take take-up platforms at<br />

intermediate level, internal and external belt cleaners, pull chord switches, belt sway and<br />

zero speed switches, electro electro-hydraulic hydraulic thruster brakes, all electricals etc. including RCC<br />

tunnel for receiving Conveyor RC RC-1 and nd underground tunnel portion upto pent house of<br />

Conveyor RC-1 1 with all civil, structural and architectural works for conveyor gallery, gallery<br />

supporting trestles and their associated foundations.<br />

3.1.8 A new pent house along with over ground structures structures, for conveyor Rc-1<br />

complete with all<br />

civil structural, architectural and electrical works including chutes, monorails, hoists/chain<br />

pulley blocks, hoist maintenance platforms, RCC/steel floors, external staircases, hand rails<br />

etc.<br />

3.1.9 A transfer point TP-1 1 complete with civil, structural and electrical works and associated<br />

foundations for transfer of coal from conveyor RC RC-1 to conveyor RC-2.<br />

3.1.10 Complete chute work along with chute plug switches and actuator operated flap gates in all<br />

Transfer points, nts, maintenance platforms along with suitable approach.<br />

3.1.11 Adequate number of ventilation equipment for ventilating the wagon tippler hopper,<br />

underground conv. RC-1 1 upto Pent House, complete with all mechanical, electrical, civil and<br />

structural works.<br />

3.1.12 Pressurised Ventilation system for all Switchgear rooms, MCC rooms complete with all<br />

mechanical, electrical, accessories, civil and structural works.<br />

Technical Specification Sec-2,:Intent :Intent of Specifications<br />

Page 6 of 17