The LD shall be assessed on the basis of conveyor equipment having the poorest<br />

performance.<br />

9.0 COMMISSIONING (SYSTEM TRIAL OPERATION)<br />

Duration of the trial operation of the he complete equipment shall be 30 continuous days with<br />

available no of loaded rakes during the period or as to be mutually agreed agreed.<br />

10.0 TYPE TESTS AND TYPE TEST CHARGES<br />

10.1 All equipment / systems to be supplied shall conform to type tests as per re relevant standards<br />

and proven type.<br />

10.2 The Bidder / Contractor shall furnish the reports of all the type tests carried out within five<br />

years of the date of bid opening as per specification and relevant standards for all<br />

components / equipments / systems. These reports should be for the tests conducted on<br />

identical / similar components / equipments / systems to those offered / proposed to be<br />

supplied under this contract.<br />

10.3 In case contractor is not able to submit report of type test(s) conducted in last five years, or<br />

in case type test report(s) are not found to be meeting the specification / relevant standard<br />

requirements, then all such tests shall be conducted under this contract by the Contractor<br />

free of cost to Owner, and reports shall be submitted ffor<br />

approval.<br />

10.4 All acceptance and routine tests as per relevant standard and specification shall be carried<br />

out. Charges for these shall be deemed to be included in the bid price.<br />

11.0 SPARES<br />

11.1 GENERAL<br />

The Contractor shall include in his scope of supply all the necessary Mandatory spares, start<br />

up and commissioning spares and recommended spares and indicates these in the relevant<br />

schedules of the Bid Form and Price Schedules. The general requirements pertaining to the<br />

supply of these spares have bbeen<br />

described in the following paras.<br />

11.2 MANDATORY SPARES<br />

11.2.1 The list of mandatory spares considered essential by the Owner Owner/RITES /RITES is included in this<br />

specification. The Bidder shall indicate the prices for each and every item (except for items<br />

not applicable to the Bidders design) in th the e ‘Schedule of mandatory Spares . If the Bidder<br />

fails to comply with the above or fails to quote the price of any spare item, the cost of such<br />

spares shall be deemed to be included in the bid price unless the bidder specifies "not<br />

applicable" for the type of equipment/system offered by hi him. m. However during execution if<br />

such spares are found to be applicable, the Contractor shall supply them without extra cost<br />

to the Owner. The Bidder shall furnish the population per unit of each item in the relevant<br />

Technical Specification Sec-2,:Intent :Intent of Specifications<br />

Page 14 of 17