.<br />

11.0 INSURANCE<br />

11.01 The Owner will arrange for INSURANCE of equipment and material, included under the scope of<br />

contract, to cover -<br />

a) Risk in transit by ship/air between Contractor’s port of shipment/air port and Indian port of<br />

entry.<br />

b) Risks in transit by rail/road during inland transportation up to the Project Site.<br />

c) Risks during storage and erection at the Project Site till the plant is fully commissioned<br />

under an open general insurance policy. The Owner shall intimate the name of Insurance<br />

Company and other details in due course.<br />

11.02 The Contractor shall furnish dispatch particulars of each consignment including its value<br />

immediately to the Insurance Company. If for any delay in intimating of dispatch particulars to the<br />

Insurance Company on the part of the Contractor the claims for damages are rejected, the<br />

contractor shall be fully responsible for replacement of the damaged equipment.<br />

11.03 The risks that are to be covered under the insurance shall include, but not limited to, the loss or<br />

damage in transit, theft, pilferage, riot, civil commotion, weather conditions, accidents of all kinds,<br />

fire, war risk, etc. The scope of such insurance shall cover the entire value of the Works from time<br />

to time.<br />

11.04 In respect of equipment damaged in transit or during erection and commissioning, the Contractor<br />

shall replace them expeditiously and the replacement cost payable by the Owner shall be limited to<br />

the invoice of damaged equipment. In case of consignment received at the project site in outwardly<br />

sound condition of package but found shortage/damage on being opened the liability for free<br />

replacement will be accepted by the Contractor.<br />

It is the responsibility of the Contractor to lodge a claim on the Insurance Co. on behalf of the<br />

Owner. On receipt of all relevant document relating to the claim, Owner will pursue the matter with<br />

the Insurance Co.<br />

12.00 DELIVERY<br />

Notification of delivery or dispatch in regard to each and every consignment shall be made to the<br />

Purchaser immediately after dispatch or delivery. The Contractor shall further supply to the<br />

Consignee a price invoice and packing account of all stores delivered or dispatched by him. All<br />

packages, containers, bundles and loose materials forming part of each and every consignment<br />

shall be described fully in the packing account, and full details of the contents of packages and<br />

quantity of materials shall be given to enable the Consignee to check the stores on arrival at<br />

destination.<br />

Tender Documents Commercial (Indigenous) Page 14 of 56