.<br />

Dimensions of each package shall not exceed the maximum dimensions of packages which can be<br />

accepted for transport over the `broad gauge system’ of the Railway concerned.<br />

10.0 SHIPMENT PARTICULARS<br />

10.01 Shipments<br />

a) Foreign Items<br />

Responsibility of shipment of plant and equipment shall lie with the Contractor wherever<br />

the contract is for complete supply and installation or supply delivered at site basis. The<br />

Contractor shall notify the Purchaser of the date of each shipment from the port of<br />

embarkation as well as date of arrival of such shipment at designated port of arrival for<br />

information.<br />

Responsibility of cleaning the same in the port including all handling shall lie with the<br />

Contractor. Purchaser will only arrange to pay the customs duty as per information on CIF<br />

values given by the Contractor sufficiently in advance.<br />

The Contractor shall give complete shipping information concerning the weight, size,<br />

content of each package including any other information the Purchaser may require.<br />

b) Indigenous Item<br />

For all contracts for supply and installation or supply delivery at site basis, responsibility of<br />

all transportation from works to site shall lie with the Contractor.<br />

The Contractor shall notify the Owner of the date of each shipment from his works and the<br />

expected date of arrival at the site for information of the Purchaser.<br />

The Contractor shall also give all information concerning the weight, size and content of<br />

each packing including any other information the Purchaser may require.<br />

c) The Contractor shall further be responsible for all inland transportation up to site for foreign<br />

items after clearing through the port. Contractor shall also be responsible for making all<br />

necessary arrangements for loading, unloading and other handling right from his works till<br />

the site and also till the equipment is erected, tested and commissioned. He shall be solely<br />

responsible for proper storage and safe custody of all equipment.<br />

10.02 Shipping Documents<br />

After shipment is affected following documents shall be forwarded to the Purchaser:<br />

Tender Documents Commercial (Indigenous) Page 12 of 56