galleries, trestles, penthouses, Wagon tippler hopper, underground tunnels, transfer points,<br />

finishes, hes, complete architectural aspects, drainage and all other civil, architectural and<br />

structural works associated with the complete Wagon Tippler and conveyor system<br />

Package.<br />

3.3.3 Scope of work shall also include dismantling and modifications of the exi existing<br />

structures/facilities, which may be required to facilitate, inter connection between the<br />

existing and the new structures or facilities and making good the dismantled/modified<br />

structures.<br />

4.0 TERMINAL POINTS<br />

Terminal point for Wagon Tippler and conveyor system commences from wagon tippler<br />

complex upto feeding points at conveyors BC BC-103 & BC-115, 115, in Junction House (JH (JH-1)<br />

including the modification necessary to the Junction Houseand and interconnection with the<br />

existing system. Within these terminal points, all equipment and services, civil, structural<br />

and architectural works, electrical distribution, piping network etc. as required for wagon<br />

tippler and conveyor system package will be furnished and erected by the co contractor unless<br />

specifically excluded.<br />

4.1 Contractor's Scope responsibilities shall include but not be limited to the following:<br />

4.1.1 Wherever Contractor is permitted by Owner to take support from any of the Owner’s<br />

Structures, the Contractor shall ensure that no damage is done, to the Owner’s Structures<br />

including Painting thereof. In case of any damage to the Owners Structure and/or Painting,<br />

then the Contractor shall rectify the same to the complete satisfaction of the Owner.<br />

4.1.2 The contractor shall carry out the redesign of JH JH-1 1 and shall ensure that the proposed<br />

modifications are adequate to support the discharge point of the conveyor RC RC-2 as well.<br />

4.1.3 Regarding erection of transfer point on existing junction house house-1, 1, contractor shall ensur ensure<br />

that opening on existing building and erection of conveyor chutes/skirts & platform are done<br />

in a manner to minimize shut down of existing conv. BC BC-103 & BC-115. 115. As work is to be<br />

executed in operating project, extra care must be taken by the Contractor.<br />

4.1.4 Water supply connections for dust suppression, service water system & cooling water shall<br />

be provided by the Owner, details of which are given elsewhere in the specification. Further<br />

network of piping including all compressors, pumps, tanks, necessa necessary ry accessories, supports<br />

and fittings etc. for distribution of water for dust suppression and service water system in all<br />

transfer points, control rooms, MCC rooms, toilets, Machinery hatches of the Wagon tippler<br />

etc. shall be under the scope of the contra contractor.<br />

4.1.5 Road lighting in wagon tippler area, for the roads, is included in the scope of Contractor.<br />

4.2 EXCLUSIONS<br />

Technical Specification Sec-2,:Intent :Intent of Specifications<br />

Page 10 of 17