4.12.3 Field Quality Plans will detail out for all the equipment, the quality practices and procedures<br />

etc. tc. to be followed by the Contractor’s "Site Quality Control Organisation", during various<br />

stages of site activities starting from receipt of materials/equipment at site.<br />

4.12.4 The Contractor shall also furnish copies of the reference documents/plant<br />

standards/acceptance ndards/acceptance norms/tests and inspection procedure etc., as referred in Quality<br />

Plans along with Quality Plans. These Quality Plans and reference documents/standards etc.<br />

will be subject to Employer’s approval without which manufacturer shall not proce proceed. These<br />

approved documents shall form a part of the contract. In these approved Quality Plans,<br />

Employer shall identify customer hold points (CHP), i.e. test/checks which shall be carried<br />

out in presence of the Employer’s Project Manager or his authorised representative and<br />

beyond which the work will not proceed without consent of Employer in writing. All<br />

deviations to this specification, approved quality plans and applicable standards must be<br />

documented and referred to Employer along with technical justif justification ication for approval and<br />

dispositioning.<br />

4.12.5 No material shall be despatched from the manufacturer’s works before the same is<br />

accepted, subsequent to predespatch final inspection including verification of records of all<br />

previous tests/inspections by Em Employer’s ployer’s Project Manager/Authorised representative and<br />

duly authorised for despatch by issuance of Material Despatch Clearance Certificate (MDCC).<br />

4.12.6 All material used for equipment manufacture including casting and forging etc. shall be of<br />

tested quality lity as per relevant codes/standards. Details of results of the tests conducted to<br />

determine the mechanical properties; chemical analysis and details of heat treatment<br />

procedure recommended and actually followed shall be recorded on certificates and time<br />

temperature emperature chart. Tests shall be carried out as per applicable material standards and/or<br />

agreed details.<br />

4.12.7 The contractor shall submit to the Employer Field Welding Schedule for field welding<br />

activities in the enclosed format No.: QS QS-01-QAI-P-02/F3. The field welding schedule shall be<br />

submitted to the Employer along with all supporting documents, like welding procedures,<br />

heat treatment procedures, NDT procedures etc. at least ninety days before schedule start<br />

of erection work at site.<br />

4.12.8 All welding and brazing shall be carried out as per procedure drawn and qualified in<br />

accordance with requirements of ASME Section IX/BS IX/BS-4870 4870 or other International equivalent<br />

standard acceptable to the Employer. All welding/brazing procedures shall be submitte submitted to<br />

the Employer or its authorized representative for approval prior to carrying out the<br />

welding/brazing.<br />

4.12.9 All brazers, welders and welding operators employed on any part of the contract either in<br />

Contractor’s/sub-contractor’s contractor’s works or at site or eelsewhere<br />

lsewhere shall be qualified as per ASME<br />

Section-IX or BS-4871 4871 or other equivalent International Standards acceptable to the<br />

Employer.<br />

Technical Specifications: Sec-5,General Techn chnical Requirements<br />

Page 15 of 27