25.04.2013 Views

NATIONAL ALUMINIUM COMPANY LIMITED - Rites

NATIONAL ALUMINIUM COMPANY LIMITED - Rites

NATIONAL ALUMINIUM COMPANY LIMITED - Rites

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

automatic controls for positioning, tipping and discharging the entire ccontents<br />

ontents of the wagons<br />

into the hopper.<br />

5.1 Wagon Unloading System<br />

5.1.1 The rake comprising of specified maximum maximum60number number of wagons shall be pushed into the<br />

reach of in-haul haul equipment by a locomotive. Further placing of wagons over tippler<br />

platforms and carrying aw away ay the empty wagons shall be accomplished with the help of a side<br />

arm charger under scope of bidder.<br />

5.1.2 Wagon unloading equipment shall be suitable to handle any type of wagons being used by<br />

Indian Railways for transportation of coal. Thus side arm charger aand<br />

nd wagon tippler shall be<br />

suitable to handle all standard broad gauge (1676 mm) wagons of RDSO design used by<br />

Indian Railways conforming to latest revision of IS: 10095.<br />

5.1.3 Maximum moving dimensions of locomotive & wagon as per Indian Railway norms shall be<br />

adopted for providing clearances with respect to structures, equipment and tippler<br />

arrangement.<br />

5.1.4 Complete wagon tippler and accessories shall have the approval of concerned Indian Railway<br />

Authorities and RDSO. Further, the contractor shall submit to the Owner detailed drawings<br />

of wagon tippler and accessories including civil and structural drawing only after getting the<br />

same approved from the concerned Railway authorities.<br />

5.1.5 The bidder shall obtain all statutory approvals from the relevant Railway authorit authorities, before<br />

the wagon tippler complex is put into operation. Any statutory payment charges, to be made<br />

to the concerned authorities shall be to Bidder’s account. It is the responsibility of the<br />

Contractor to carry out any modifications as required by the RRailway<br />

ailway authorities, at no extra<br />

cost to the Owner.<br />

5.2 Wagon Tippler Hopper<br />

5.2.1 The wagon tippler hopper shall be of RCC construction and adequately sized to<br />

accommodate the coal load for atleast two (2) nos. 8 wheeled wagons of RDSO design used<br />

by Indian ian Railways. For effective volumetric capacity computation of the hopper, the angle<br />

of repose of coal shall be considered as 37°. The minimum valley angle of the hopper shall<br />

be considered as 60°. The hopper shall have opening below which apron feeders sh shall be<br />

provided to evacuate coal from the hopper and feed onto associated belt conveyors below.<br />

Complete inside surfaces of the hopper shall be provided with 50 mm thick guniting. Further<br />

it shall be possible to empty out all the coal, without any dead sto stock ck from the hopper.<br />

5.2.2 Steel gratings of mesh size 30 300 mm x 300 mm over wagon tippler hopper shall be provided.<br />

The gratings shall be built of minimum 200 mm x 36 mm thick flats. The hopper and gratings<br />

shall be designed for movement of ffront<br />

end loader/bulldozer over them. Bull Bull-dozer weight<br />

shall be considered as about 35 T.<br />

Technical Specification:Sec-4,System System Parameters, Operation & Control Philosophy<br />

Page 12 of 64

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!